| Document Number | Date | Subject | Preparer | Rev | Review Freq. (yrs.) |
Last Reviewed |
| DL-QAP-1003 | 5/16/2008 | Light Sources Directorate EMS/OHSAS Records Management | Cheswick, Ed | A | 3 | 5/16/2008 |
| LS-ADM-0002 | 3/27/2007 | Access to Property Protection Areas | Kiss, Robert | C | 3 | 10/19/2010 |
| LS-ADM-0003 | 5/15/2007 | Overhead Crane Use Procedure for NSLS OOS (Out-of-Service) Cranes | Kiss, Robert | 1 | 1 | 11/14/2011 |
| LS-ADM-0004 | 3/28/2008 | NSLS Temporary Storage Area Policy | Kiss, Robert | 1 | 3 | 3/28/2008 |
| LS-AI-0001 | 9/16/2010 | The NSLS X-Ray Ring Active Interlock System Operations Policy | Zitvogel, Emil | E | 2 | 9/16/2010 |
| LS-AI-0002 | 1/22/2004 | X17 Super Conducting Wiggler E-B Space Active Interlock Operational Test | Zuhoski, Peter | A | 5 | 5/5/2009 |
| LS-AI-0003 | 3/9/2004 | Active Interlock Local Logic Commissioning Procedure for X-29 | Rothman, Jeff | 1.0 | 5 | 2/19/2009 |
| LS-CD-0001 | 1/1/2008 | Insertion Device LOTO for X1, X13 MGU, X13EPW, X21, X25, X29 & VUV TOK | Danneil, Chris | D | 1 | 12/30/2011 |
| LS-CD-0002 | 3/1/2005 | Insertion Device Beam Pipe Switch Bypass Procedure | Danneil, Chris | B | 1 | 12/30/2011 |
| LS-CD-0003 | 3/1/2005 | ATA-2001 Calibration for Insertion Device LVDT's | Danneil, Chris | B | 3 | 1/11/2011 |
| LS-CD-0005 | 2/16/2005 | Bench Test Procedure for the Active Interlock Local Logic 2 (SLS 61.271) | Tallent, Jack | B | 5 | 2/3/2010 |
| LS-CD-0006 | 1/1/2004 | Bench Test Procedure for Active Interlock Central Logic Chassis (SLS 61.150) and Control Room Display Chassis (SLS 61.77) | Tallent, Jack | A | 5 | 5/5/2009 |
| LS-CD-0007 | 1/1/2004 | Bench Test of the Active Interlock 16 Channel Buffer Chasis (SLS 61.52) | Tallent, Jack | A | 5 | 5/5/2009 |
| LS-CD-0008 | 1/1/2004 | Bench Test of Active Interlock Aux Fault Combiner Chassis SLS 61.178 | Tallent, Jack | A | 5 | 5/5/2009 |
| LS-CD-0009 | 1/1/2008 | Insertion Device LOTO for VUV U5 | Danneil, Chris | C | 1 | 12/30/2011 |
| LS-CD-0010 | 6/6/2008 | Uninterruptile Power Systems | Danneil, Chris | D | 1 | 3/18/2011 |
| LS-CD-0011 | 4/1/2008 | Scraper LOTO, VUV U5 & X-Ray X13 | Danneil, Chris | B | 1 | 12/30/2011 |
| LS-CO-0001 | 10/22/2007 | NSLS Conduct of Operations Manual | Buckley, Michael | B | 5 | 10/22/2007 |
| LS-CO-0002 | 10/22/2007 | Conduct of Operations Exceptions & Deviations | Buckley, Michael | B | 5 | 10/22/2007 |
| LS-CS-0001 | 5/20/2011 | Computer System Call-In List | Yin, Zhijan | 3 | 2 | 5/20/2011 |
| LS-CS-0002 | 3/1/2001 | NSLS Computer Serial Communications Requirements | Yin, Zhijan | A | 5 | 2/28/2011 |
| LS-ES-0002 | 5/24/2011 | Procedure for Acid Etching of Silicon and Germanium Crystals | Lenhard, Anthony | 4 | 3 | 5/24/2014 |
| LS-ES-0003 | 1/30/2003 | Procedure for testing NSLS crystal cutter RGD diffraction unit shutter control lights | Greene, Richard | A | 5 | 12/12/2007 |
| LS-ES-0004 | 3/7/2011 | Access Controls - Building 725, Rooms 2-101 Property Protection Area | Yin, Zhijan | D | 1 | 3/7/2011 |
| LS-ES-0005 | 11/23/2009 | Transport Enclosure Wall Panel Removal/Installation using "Tecknit" Lifting Fixture | Haas, Edwin | A | 3 | 11/23/2009 |
| LS-ESH-0004 | 12/17/2009 | NSLS Operations Group Chemical Spill and Gas Release Response | Ackerman, Andrew | 05 | 3 | 12/17/2009 |
| LS-ESH-0007 | 1/9/2002 | Scripts to be used by NSLS Machine Operators During and Emergency. | Chmiel, Robert | 1 | 3 | 3/10/2011 |
| LS-ESH-0009 | 2/24/2010 | Qualified Search Personnel for NSLS Accelerators | Chmiel, Robert | D | 1 | 6/13/2012 |
| LS-ESH-0010 | 3/9/2005 | VUV Injection Shutter LOTO | Buckley, Michael | B | 1 | 7/21/2010 |
| LS-ESH-0011 | 7/22/2010 | Radiation Safety LOTO | Buckley, Michael | C | 1 | 7/22/2010 |
| LS-ESH-0012 | 2/11/2008 | Linac LOTO | Buckley, Michael | C | 1 | 7/21/2010 |
| LS-ESH-0013 | 9/16/2008 | Controlled Access to the VUV Ring | Chmiel, Robert | C | 3 | 6/13/2012 |
| LS-ESH-0014 | 2/13/2008 | Radiation Safety Interlocks at the National Synchrotron Light Source | Buckley, Michael | 3 | 3 | 3/24/2011 |
| LS-ESH-0016 | 9/19/2008 | Radiation Badge Wearer's Instructions at the NSLS | Stiegler, Lori | 8 | 5 | 9/19/2008 |
| LS-ESH-0017 | 10/31/2010 | Transport of Hazardous and Radioactive Materials | Stiegler, Lori | 4 | 2 | 10/31/2010 |
| LS-ESH-0019 | 12/29/2009 | Beam Line Configuration Control Checklist Requirements | Chmiel, Robert | D | 2 | 12/29/2009 |
| LS-ESH-0020 | 12/12/2007 | Biosafety Requirements at the NSLS | Ackerman, Andrew | B | 3 | 11/30/2010 |
| LS-ESH-0021 | 12/12/2007 | Biosafety Level 2 work at the NSLS/A Technical Basis | Ackerman, Andrew | B | 3 | 11/30/2010 |
| LS-ESH-0023 | 7/15/2003 | X-Ray Injection Shutter LOTO | Buckley, Michael | A | 1 | 7/21/2010 |
| LS-ESH-0024 | 6/19/2009 | Visible Light Hazard at the NSLS VUV and X-Ray Rings | Hulbert, Steve | C | 5 | 6/19/2009 |
| LS-ESH-0026 | 9/16/2011 | Laser Program Documentation U2A | Liu, Zhenxian | 4 | 1 | 9/16/2011 |
| LS-ESH-0027 | 10/15/2010 | U6/U13 Laser Safety Program Documentation | Carr, Larry | 6 | 1 | 10/15/2010 |
| LS-ESH-0030 | 1/15/2010 | NSLS Procedures for Preparing and Operating Infrared Laboratories IR Detectors Using Pumped Liquid He (T<4.2K) | Carr, Larry | B | 3 | 1/15/2010 |
| LS-ESH-0031 | 1/15/2010 | NSLS Procedures for Preparing and Operating Infrared Laboratories IR Detectors Using T=4.2K (Non-Pumped Liquid He) | Carr, Larry | B | 3 | 1/15/2010 |
| LS-ESH-0032 | 12/1/2010 | Laser Program Safety Documentation X20C | jordan-sweet, jean | 4 | 1 | 10/26/2011 |
| LS-ESH-0034 | 3/13/2008 | Response to "WORKDAY & HOURLY RADIATION ALARMS" - Channel 26 | Buckley, Michael | C | 2 | 9/23/2010 |
| LS-ESH-0034A | 3/16/2011 | Authorization List - Permission to Exceed Area Radiation Monitor Action Levels | Buckley, Michael | E | 2 | 3/16/2011 |
| LS-ESH-0036 | 2/9/2011 | X-Ray Beamline Hutch Search Procedure | Buckley, Michael | B | 5 | 2/9/2011 |
| LS-ESH-0039 | 3/4/2005 | Worker Qualification Matrices | Buckley, Michael | A | 1 | 8/9/2010 |
| LS-ESH-0040 | 9/14/2011 | NSLS Dark Room Procedure | Raghothamachar, Balaji | 4 | 2 | 9/14/2011 |
| LS-ESH-0044 | 4/20/2012 | 90-DAY WASTE STORAGE AREA CONTINGENCY PLAN | McDonald, Thomas | 8 | 1 | 4/20/2015 |
| LS-ESH-0048 | 10/17/2011 | X7B Gas Cabinet Procedure | Hanson, Jonathan | 2 | 2 | 10/17/2011 |
| LS-ESH-0049 | 9/17/2007 | SDL Laser Interlock Test LOTO | McDonald, Thomas | A | 1 | 6/13/2012 |
| LS-ESH-0051 | 10/1/2007 | Operation of Nano-Material Hood in Room 1-128 | Stiegler, Lori | 1 | 2 | 8/8/2011 |
| LS-ESH-0052 | 8/5/2008 | Devalving of Compressed Gas Cylinders | Klaus, Keith | 2 | 5 | 8/5/2008 |
| LS-ESH-0056 | 1/5/2009 | Special Requirements for Working With Hydrofluoric Acid at NSLS After Normal Business Hours | Klaus, Keith | 1 | 5 | 1/5/2009 |
| LS-ESH-0065 | 6/16/2009 | Building 729 Fire Hazard Assessment/Fire Hazard Analysis | Chmiel, Robert | 1 | 3 | 6/16/2009 |
| LS-ESH-0066 | 4/24/2009 | Operating Procedure: NSLS X-Ray Generator at U7A | Rodriquez, Jose | 1 | 3 | 4/24/2009 |
| LS-ESH-0068 | 7/15/2009 | Building 725 Fire Hazard Analysis/Fire Hazard Assessment | Chmiel, Robert | 1 | 3 | 7/15/2009 |
| LS-ESH-0069 | 7/30/2009 | Define Experiment Sample CMS Requirements at NSLS | Klaus, Keith | 1 | 3 | 7/30/2009 |
| LS-ESH-0070 | 9/30/2009 | NSLS Gas Cylinder Cart Inspections | Stiegler, Lori | 1 | 3 | 9/30/2009 |
| LS-ESH-0071 | 11/23/2009 | X17 Transport Enclosures Commissioning and Survey Plan | Chmiel, Robert | A | 1 | 3/10/2011 |
| LS-ESH-0075 | 5/10/2010 | X10C Gas Handling System | Sansone, Michael | 1 | 3 | 5/10/2010 |
| LS-ESH-0077 | 8/30/2010 | X17 Small Transport Enclosure Access Plan | Chmiel, Robert | A | 3 | 8/30/2010 |
| LS-ESH-0078 | 10/27/2010 | X17A Beamline Commissioning and Survey Plan | Chmiel, Robert | A | 1 | 10/27/2010 |
| LS-ESH-0079 | 5/13/2011 | X17B3 Laser Safety Program Documentation | Hong, Xinguo | 1 | 1 | 6/7/2012 |
| LS-ESH-0080 | 5/17/2011 | Hutch Exhaust Flow Test | Buckley, Michael | A | 3 | 5/17/2011 |
| LS-ESH-0082 | 10/1/2011 | X10C Gas Handling System Procedure | Fareria, Larry | 1 | 3 | 10/1/2011 |
| LS-ESH-0084 | 9/26/2011 | Securing the X1A1 Sample Chamber | Chmiel, Robert | A | 3 | 9/26/2011 |
| LS-ESH-PRM-0.1.0 | 8/10/2011 | Minors | Stiegler, Lori | 12 | 3 | 8/10/2011 |
| LS-ESH-PRM-0.2.0 | 6/7/2011 | Policy for Access to NSLS & SDL Controlled Areas Including TLD Requirements | Ackerman, Andrew | 10 | 3 | 6/7/2011 |
| LS-ESH-PRM-1.2.0 | 4/29/2009 | Environmental, Safety and Health Inspections | Klaus, Keith | 8 | 3 | 4/29/2009 |
| LS-ESH-PRM-1.3.5b | 1/3/2008 | Beamline Safety Review | Ackerman, Andrew | 8 | 3 | 11/30/2010 |
| LS-ESH-PRM-1.3.6 | 5/8/2007 | Work Planning and Control Procedure | Boerner, Albert | 6 | 3 | 5/4/2010 |
| LS-ESH-PRM-1.5.0 | 5/4/2010 | Electrical Safety | Chmiel, Robert | 18 | 3 | 5/4/2010 |
| LS-ESH-PRM-1.5.1 | 7/28/2011 | Lockout/Tagout (LOTO) Requirements | McDonald, Thomas | 12 | 3 | 7/28/2011 |
| LS-ESH-PRM-1.5.2 | 1/12/2009 | Standards for use of Coaxial Cables and Connectors in Signal and High Voltage Systems by NSLS Users and Staff | Ackerman, Andrew | 3 | 3 | 1/2/2009 |
| LS-ESH-PRM-1.5.3 | 3/10/2010 | Interlock Safety | Buckley, Michael | 9 | 3 | 3/10/2010 |
| LS-ESH-PRM-1.5.4 | 5/4/2010 | Beamline Hazardous Equipment Labeling Requirements | Chmiel, Robert | 2 | 3 | 5/4/2010 |
| LS-ESH-PRM-1.6.0/1.6.1 | 9/24/2008 | Material Handling: Equipment and Procedures | Kiss, Robert | 4 | 3 | 9/24/2008 |
| LS-ESH-PRM-1.9.0 | 10/4/2009 | Consumption of Food in the NSLS Experimental Areas | Chmiel, Robert | 1 | 3 | 10/4/2009 |
| LS-ESH-PRM-2.1.0 | 6/27/2011 | Hazard Communication Program | Stiegler, Lori | 8 | 3 | 6/27/2011 |
| LS-ESH-PRM-2.1.2 | 9/10/2007 | Storage, Usage, Containment & Transfer of Toxic & Hazardous Chemicals | Chmiel, Robert | 5 | 3 | 2/8/2011 |
| LS-ESH-PRM-2.4.0 | 6/4/2010 | Exhaust Ventilation | Stiegler, Lori | 2 | 3 | 6/4/2010 |
| LS-ESH-PRM-2.6.0 | 1/28/2010 | Beryllium Management | Klaus, Keith | 1 | 3 | 1/28/2010 |
| LS-ESH-PRM-2.7.0 | 4/8/2011 | Exposure Control Plan | Stiegler, Lori | 1 | 1 | 6/13/2012 |
| LS-ESH-PRM-3.2.0 | 12/28/2009 | Collective Dose Goals | Zafonte, Frank | 5 | 1 | 12/20/2010 |
| LS-ESH-PRM-3.2.1 | 8/26/2009 | Administrative Control Levels | Casey, W.R. | 6 | 3 | 8/26/2009 |
| LS-ESH-PRM-5.1.0 | 8/11/2009 | Cryogenic Liquids, Storage, Usage and Handling | Stiegler, Lori | 6 | 3 | 8/11/2009 |
| LS-ESH-PRM-7.0.0 | 4/15/2011 | Hazardous Waste Management | McDonald, Thomas | 10 | 3 | 4/15/2011 |
| LS-FRA-0001 | 8/15/2008 | General Chemical Hazards | Ackerman, Andrew | 2 | 3 | 8/15/2008 |
| LS-FRA-0002 | 8/15/2008 | General Fire Issues - Facility Fire Hazards and Controls | Ackerman, Andrew | 3 | 3 | 8/15/2008 |
| LS-FRA-0004 | 8/15/2008 | General Electrical Issues | Ackerman, Andrew | 2 | 3 | 8/15/2008 |
| LS-FRA-0005 | 8/15/2008 | General Material Handling Hazards | Ackerman, Andrew | 2 | 3 | 8/15/2008 |
| LS-FRA-0008 | 8/15/2008 | General Radiation Issues | Ackerman, Andrew | 2 | 3 | 8/15/2008 |
| LS-FRA-0009 | 8/15/2008 | General ODH (Oxygen Deficiency Hazard) Issues | Ackerman, Andrew | 2 | 3 | 1/20/2012 |
| LS-INT-0002 | 3/7/2002 | X-Ray Safety Shutter Solenoid Replacment Procedure | Gallagher, John | B | 3 | 10/12/2011 |
| LS-INT-0003 | 1/14/2004 | X17 Wiggler Power Supply Interlock Test Procedure | Orr, Ewart | A | 2 | 2/23/2012 |
| LS-INT-0004 | 1/22/2004 | Critical Device Over Temperature Interlock Klixon Test Procedure | Orr, Ewart | A | 2 | 1/9/2012 |
| LS-INT-0005 | 1/23/2004 | Test Procedure for the Critical Device Over Temperature Interlock Aluminum Section | Orr, Ewart | A | 2 | 1/9/2012 |
| LS-INT-0006 | 1/23/2004 | Critical Device Over Temperature Interlock, RF Dump Test Procedure | Orr, Ewart | A | 2 | 12/13/2010 |
| LS-INT-0007 | 2/28/2005 | Fast Valve Trigger Box Removal | Gallagher, John | A | 5 | 10/12/2011 |
| LS-INT-0008 | 2/28/2005 | Removal/Replacement of X17B2 Backstop Switches | Gallagher, John | A | 5 | 10/12/2011 |
| LS-INT-0009 | 2/28/2005 | Fast Valve Sensor Calibration Procedure | Gallagher, John | A | 5 | 10/12/2011 |
| LS-INT-0015 | 12/1/2007 | Procedure for Mode One Logic Board Bench Test (AC & DC) | Orr, Ewart | A | 2 | 10/12/2011 |
| LS-JRA-0001 | 2/7/2009 | Electrical & Electronic Shop Work | Ackerman, Andrew | 3 | 3 | 2/7/2009 |
| LS-JRA-0005 | 2/7/2009 | Performing LOTO | Ackerman, Andrew | 3 | 3 | 2/14/2012 |
| LS-JRA-0006 | 9/24/2010 | Mechanical Assembly of Accelerator or Beam Line Components | Ackerman, Andrew | 3 | 3 | 9/24/2010 |
| LS-JRA-0009 | 9/28/2010 | Work with Compressed Gas Cylinders and Systems | Ackerman, Andrew | 3 | 3 | 9/28/2010 |
| LS-JRA-0010 | 7/6/2009 | General Cryogenic Work | Ackerman, Andrew | 4 | 3 | 7/6/2009 |
| LS-JRA-0012 | 9/23/2010 | Work With Cooling Water Systems 2010 JRA Review | Ackerman, Andrew | 3 | 3 | 9/23/2010 |
| LS-JRA-0020 | 7/10/2009 | Work With Laboratory Chemicals | Ackerman, Andrew | 3 | 3 | 7/10/2009 |
| LS-JRA-0021 | 7/10/2009 | Routine Chemical Use | Ackerman, Andrew | 3 | 3 | 7/10/2009 |
| LS-JRA-0023 | 8/5/2010 | Use of Unsealed Radioactive Materials | Ackerman, Andrew | 3 | 3 | 8/5/2010 |
| LS-JRA-0024 | 8/5/2010 | Radioactive Source Use | Ackerman, Andrew | 3 | 3 | 8/5/2010 |
| LS-JRA-0026 | 8/20/2008 | Job Risk Assessment: Generating Hazardous Waste | Ackerman, Andrew | 2 | 3 | 9/1/2011 |
| LS-JRA-0027 | 8/20/2008 | Job Risk Assessment: Generating Radioactive and Mixed Waste | Ackerman, Andrew | 2 | 3 | 8/24/2011 |
| LS-JRA-0030 | 9/22/2010 | Operate an Accelerator | Ackerman, Andrew | 4 | 3 | 9/22/2010 |
| LS-JRA-0032 | 7/1/2008 | Magnetic Field Work | Ackerman, Andrew | 2 | 3 | 7/1/2008 |
| LS-JRA-0033 | 10/3/2008 | Work With Lasers | Ackerman, Andrew | 2 | 3 | 10/3/2008 |
| LS-JRA-0035 | 8/25/2008 | Elevated Work | Ackerman, Andrew | 2 | 3 | 8/25/2008 |
| LS-JRA-0036 | 9/3/2010 | Use of Portable Ladders | Ackerman, Andrew | 3 | 3 | 9/23/2010 |
| LS-JRA-0041 | 8/5/2010 | Radiation Generating Devices | Ackerman, Andrew | 2 | 3 | 8/5/2010 |
| LS-LES-0001 | 10/1/2010 | X6B Flight Path Procedure | DiMasi, Elaine | 1 | 5 | 10/1/2010 |
| LS-M-0001 | 8/16/2007 | Air Conditioning (A.C.) Call-In Procedure | Beauman, Ron | K | 1 | 1/5/2012 |
| LS-M-0003 | 10/2/2003 | Procedure for "Introducing" Equipment or Branches into an Operational NSLs Water System | Beauman, Ron | B | 5 | 10/1/2008 |
| LS-M-0004 | 9/23/1999 | Test Resistivity & Re-Charge High Pressure Copper Water System Deionizer | Beauman, Ron | A | 5 | 8/3/2011 |
| LS-M-0005 | 11/4/1999 | Test Resistivity & Re-Charge Low Pressure Copper Water System Deionizer | Beauman, Ron | A | 5 | 10/12/2010 |
| LS-M-0006 | 11/5/1999 | Test Resistivity & Re-Charge Aluminum Water System Deionizer | Beauman, Ron | A | 5 | 1/28/2010 |
| LS-M-0007 | 2/17/2009 | NSLS Emergency Plan for Maintaining Process & Cooling Systems During a High Temperature Event (A Chilled Water Shutdown) | Beauman, Ron | E | 5 | 2/17/2009 |
| LS-M-0008 | 9/12/2003 | Water Isolation Control and Alarms for NSLS Structural Biology Environmental Units | Beauman, Ron | B | 5 | 10/1/2008 |
| LS-M-0010 | 2/2/2009 | NSLS Utilities Checklists for Emergency Shutdowns | Beauman, Ron | C | 5 | 2/2/2009 |
| LS-M-0011 | 9/30/2011 | NSLS Site Compressed Air Interlock System | Beauman, Ron | C | 5 | 9/30/2011 |
| LS-M-0013 | 4/5/2006 | Procedure for Re-Setting Temperature Controller From Automatic Switch Over | Beauman, Ron | B | 5 | 2/23/2011 |
| LS-M-0014 | 12/30/2011 | Procedure to Start-Up Pumps for Low Pressure Copper System | Beauman, Ron | B | 5 | 12/30/2011 |
| LS-M-0015 | 12/30/2011 | Procedure to Start-Up Pumps for Aluminum System | Beauman, Ron | C | 5 | 12/30/2011 |
| LS-M-0016 | 4/4/2011 | Operations Group Response for X17 Superconducting Wiggler and Cryogenic System Alarms | Freudenburg, Richard | 5 | 5 | 4/4/2011 |
| LS-M-0017 | 2/12/2009 | Test Resistivity and Replace Cartridges for Experimental Water Systems | Beauman, Ron | B | 5 | 2/12/2009 |
| LS-M-0018 | 3/16/2007 | Cleaning Procedure for Magnets and Other Components | Beauman, Ron | D | 5 | 3/16/2007 |
| LS-M-0019 | 2/20/2009 | Procedure to Change Nitrogen (Bottles) for Beamline Front End Vacuum Valves & Shut-Off Valve Rebuild Information | Beauman, Ron | D | 5 | 2/20/2009 |
| LS-M-0020 | 6/17/2005 | Procedure for Proteus Switch Adjustment and Maintenance | Beauman, Ron | B | 5 | 7/14/2010 |
| LS-M-0021 | 6/16/2005 | Procedure for Proteus Rotor and Pin Replacement Conducted by the NSLS Control Room | Beauman, Ron | B | 5 | 7/14/2010 |
| LS-M-0024 | 6/30/2005 | Procedure for Mini-Myte Air Solenoid Replacement | Beauman, Ron | B | 5 | 4/29/2011 |
| LS-M-0025 | 6/6/2007 | Work on Laboratory Exhaust Hoods and Associated Fans | Beauman, Ron | A | 5 | 6/6/2007 |
| LS-M-0026 | 8/22/2007 | Preventive Maintenance Procedure for Air Compressors and Driers | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0027 | 8/22/2007 | Preventive Maintenance Procedure for Air Solenoids | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0028 | 8/22/2007 | Preventive Maintenance Procedure for Pneumatic Components & Lines | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0029 | 8/22/2007 | Preventive Maintenance Procedure for Pneumatic Filters | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0030 | 8/22/2007 | Preventive Maintenance Procedure for Air & Water Poly-Flo Hoses | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0031 | 8/22/2007 | Preventive Maintenance Procedure for Cold Box Units | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0032 | 8/22/2007 | Preventive Maintenance Procedure for HPC, LPC & Aluminim Di Pumps | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0033 | 8/22/2007 | Preventive Maintenance Procedure for Hytron Cooling Water Hoses | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0034 | 8/22/2007 | Preventive Maintenance Procedure for Aluminum Di Unit | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0035 | 8/22/2007 | Preventive Maintenance Procedure for Experimental Di Unit | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0036 | 8/22/2007 | Preventive Maintenance Procedure for HPC Di Unit | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0037 | 8/22/2007 | Preventive Maintenance Procedure for LPC Di Unit | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0038 | 8/22/2007 | Preventive Maintenance Procedure for Experimental System Water Filter | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0039 | 8/22/2007 | Preventive Maintenance Procedure for Motors | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0040 | 8/22/2007 | Preventive Maintenance Procedure for Water Filters | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0041 | 8/22/2007 | Preventive Maintenance Procedure for Proteus Units | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0042 | 8/22/2007 | Preventive Maintenance Procedure for HPC, LPC, Aluminum & Experimental Process Pumps | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0043 | 8/22/2007 | Preventive Maintenance Procedure for Process Water Samples | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0044 | 8/22/2007 | Preventive Maintenance Procedure for Chilled & Condenser Water Strainers | Beauman, Ron | A | 5 | 8/22/2007 |
| LS-M-0045 | 9/27/2007 | Preventive Maintenance Procedure for HPC, LPC, Aluminum and Experimental Site and Trane Heat Exchangers | Beauman, Ron | A | 5 | 9/27/2007 |
| LS-M-0046 | 4/20/2009 | NSLS Emergency Plan for a Low Temperature Event (Pipe Freezing Protection) | Beauman, Ron | A | 5 | 4/20/2009 |
| LS-M-0047 | 11/30/2011 | Procedure for Remote Pump Start and Stop for HPC, LAC Alum, and EXP | Beauman, Ron | A | 5 | 11/30/2011 |
| LS-M-0101 | 9/21/2011 | Operating Procedure for Leak Testing UHV Components | Hu, Jih-Perng | B | 3 | 9/21/2011 |
| LS-M-0102 | 9/20/2011 | Vacuum Procedure to Vent or Pump-Down Storage Ring Sector | Hu, Jingzhu | B | 3 | 9/20/2011 |
| LS-M-0103 | 9/22/2011 | Vacuum Procedrue for Baking Out VUV or X-Ray Storage Ring Sector | Hu, Jih-Perng | B | 3 | 9/22/2011 |
| LS-M-0104 | 9/23/2011 | Vacuum Procedure for Leak Testing Small Parts and Components | Hu, Jih-Perng | B | 3 | 9/23/2011 |
| LS-M-0105 | 9/23/2011 | Vacuum Procedrue for Calibration of Residual Gas Analyzer | Hu, Jih-Perng | B | 3 | 9/23/2011 |
| LS-M-0106 | 9/23/2011 | Vacuum Procedure for Testing Titanium Sublimation Pump (TSP) | Hu, Jih-Perng | B | 3 | 9/23/2011 |
| LS-M-0107 | 9/26/2011 | Procedure for Testing 220 l/sec Sputter Ion Pump (SIP) | Hu, Jih-Perng | B | 3 | 9/26/2011 |
| LS-M-0108 | 9/26/2011 | Vacuum Procedrue to Open VUV or X-Ray Front End Valve to Ring | Hu, Jih-Perng | B | 3 | 9/26/2011 |
| LS-M-0109 | 9/26/2011 | Vacuum Procedure to Back Fill and to Recover Front End Vacuum | Hu, Jih-Perng | B | 3 | 9/26/2011 |
| LS-M-0110 | 2/19/2010 | NSLS/Vacuum Procedure to Run X-Ray or VUV Front End RGA Scans Using VG SX-200 Electronics and Analyzer Heads | Hu, Jih-Perng | B | 3 | 2/19/2010 |
| LS-M-0111 | 2/19/2010 | Calibration Procedure for Sensitivity Calibrators (SC4 or SC5) Using a Transfer Method | Hu, Jih-Perng | B | 3 | 2/19/2010 |
| LS-M-0112 | 2/19/2010 | Change Filament Wire or Input to Sublimation Box | Hu, Jih-Perng | B | 3 | 2/19/2010 |
| LS-M-0113 | 2/19/2010 | Technical Specification to Remove High Voltage Connector From Ion and Dip Pumps | Hu, Jih-Perng | B | 3 | 2/19/2010 |
| LS-M-0114 | 2/19/2010 | Titanium Coating Internal Surfaces of Ceramic Chambers | Hu, Jih-Perng | B | 3 | 2/19/2010 |
| LS-M-0115 | 9/26/2011 | Procedure and Guidelines to Commission or to Re-open NSLS Beam Lines to Storage Ring Vacuum & Synchrotron Light | Hu, Jih-Perng | B | 3 | 9/26/2011 |
| LS-M-0116 | 9/28/2011 | Procedure for Bake-Out Control of VUV Ring and X-Ray Ring Sector and for Booster, Injection and Linac Sections | Hu, Jih-Perng | C | 3 | 9/28/2011 |
| LS-M-0117 | 9/30/2011 | Technical Specification to Remove High Voltage Connector From Cold Cathode Gauges and/or 2 Liter/Second Ion Pumps | Hu, Jih-Perng | C | 3 | 9/30/2011 |
| LS-M-0118 | 9/30/2011 | Technical Specification to Change Connections to Hot Filament Ion Gauges and/or to Replace a Hot Filament Ion Gauge Controller | Hu, Jih-Perng | C | 3 | 9/30/2011 |
| LS-M-0119 | 9/26/2011 | Procedure to Safely Replace a VUV or X-Ray Storage Ring Sector or Front End All-Metal Gate Value | Hu, Jih-Perng | C | 3 | 9/26/2011 |
| LS-M-0120 | 9/28/2011 | Procedure to Safely Replace a VUV or X-Ray Storage Ring Front End Fast Valve | Hu, Jih-Perng | C | 3 | 9/28/2011 |
| LS-M-0121 | 9/28/2011 | Procedure to Safely Replace Any Component Parts of the NSLS Vuv or X-Ray Storage Ring Front End Partial Pressure RGA Monitoring System | Hu, Jih-Perng | C | 3 | 9/28/2011 |
| LS-M-0122 | 3/24/2008 | Bake Out | Nintzel, Gary | A | 3 | 4/25/2011 |
| LS-M-0201 | 5/4/1999 | Subject: Optical Instrument Calibration Procedure - N-3 Level | Scheuerer, Robert | A | 5 | 9/30/2008 |
| LS-M-0202 | 5/4/1999 | Subject: Optical Instrument Calibration Procedure - Theodolite | Scheuerer, Robert | A | 5 | 9/30/2008 |
| LS-M-0203 | 6/1/2004 | Optical Instrument Calibration Procedure - Optical Plum | Scheuerer, Robert | A | 5 | 9/30/2008 |
| LS-M-0301 | 5/7/2010 | Prefentative Maintenance Procedure for NSLS Ring Magnets That Are Interlocked | Mortazavi, Payman | B | 3 | 5/7/2010 |
| LS-M-0302 | 5/7/2010 | NSLS Preventative Maintenance Procedure for Insertion Devices | Mortazavi, Payman | B | 5 | 5/7/2010 |
| LS-M-0303 | 5/7/2010 | Preventative Maintenance Procedure for NSLS Diagnostic Devices | Scheuerer, Robert | B | 1 | 5/2/2011 |
| LS-M-0304 | 2/2/2011 | VUV 52 MHz RF Systems | Mortazavi, Payman | B | 1 | 2/2/2011 |
| LS-M-0305 | 1/21/2011 | X-Ray RF System "One" | Mortazavi, Payman | B | 1 | 1/21/2011 |
| LS-M-0306 | 1/21/2011 | X-Ray RF System "Two" | Mortazavi, Payman | B | 1 | 1/21/2011 |
| LS-M-0307 | 1/21/2011 | X-Ray RF System "Three" | Mortazavi, Payman | B | 1 | 1/21/2011 |
| LS-M-0308 | 1/21/2011 | X-Ray RF System "FOUR" | Mortazavi, Payman | B | 1 | 1/21/2011 |
| LS-M-0309 | 3/28/2002 | Preventive Maintenance Procedure for NSLS X-Ray Ring Shutter Tanks | Scheuerer, Robert | A | 5 | 2/23/2007 |
| LS-M-0310 | 2/16/2011 | Oxygen Monitoring Systems Preventive Maintenance and Functional Interlock Test Procedure | Mortazavi, Payman | 6 | 1 | 2/16/2011 |
| LS-M-0403 | 2/24/2009 | Vertical Test Facility Test Procedure | Harder, Dave | A | 5 | 2/24/2009 |
| LS-M-0600 | 6/30/2002 | Test and Certification Procedure for Laser Shutter | Woodle, Marty | A | 2 | 6/30/2010 |
| LS-M-0601 | 4/8/2002 | Test Procedure for Laser Shutter Thermal Limits | Haas, Edwin | A | 5 | 10/25/2007 |
| LS-M-0602 | 1/7/2005 | Procedure for Accepting New Work for the Mechanical Section Technician/Machine Shops | Scheuerer, Robert | A | 2 | 10/22/2010 |
| LS-M-0700 | 1/25/2005 | Lifting Items Over the VUV Ring | Kiss, Robert | C | 3 | 11/14/2011 |
| LS-NSLS-0006 | 2/2/2006 | NSLS Accelerator Safety Envelope | Ackerman, Andrew | 2 | 5 | 2/2/2006 |
| LS-NSLS-0007 | 11/1/2001 | Finding of No Significant Impact: Proposed Upgrade & Improvement of the NSLS @ BNL, Upton, NY | Gmur, Nick | 1 | 5 | 8/3/2011 |
| LS-NSLS-0008 | 10/1/2001 | Environmental Assessment: Proposed Upgrade & Improvement of the NSLS @ BNL, Upton, NY | Gmur, Nick | 1 | 5 | 6/28/2011 |
| LS-NSLS-0011 | 2/1/2004 | Induced Radioactivity & Ozone Production in Air from National Synchrotron Light Source (NSLS) Operation: An Assessment for NESHAPS (National Emission Standards for Hazardous Air Polluntants) | Ackerman, Andrew | A | 1 | 6/21/2011 |
| LS-NSLS-0012 | 8/14/2006 | NSLS Safety Assessment Document (SAD) | Gmur, Nick | 2 | 5 | 8/31/2011 |
| LS-OPM-0000 | 9/28/2004 | Accelerator Operator Manual | Podobedov, Boris | C | 4 | 4/16/2009 |
| LS-OPM-0001 | 5/2/2001 | Accelerator Operator Manual - Linac/Booster Startup | Santana, Michael | B | 2 | 4/27/2011 |
| LS-OPM-0002 | 1/21/2005 | X13 Elliptical Polarized Wiggler (EPW) Operations (Accelerator Operator Manual) | Santana, Michael | C | 2 | 2/15/2011 |
| LS-OPM-0003 | 8/16/2011 | Accessing Booster Ring | Sansone, Michael | C | 2 | 8/16/2011 |
| LS-OPM-0004 | 10/30/2003 | VUV Startup/Injection Process | Santana, Michael | C | 2 | 11/8/2011 |
| LS-OPM-0005 | 1/13/2000 | Accelerator Operator Manual - Chapter 1: VUV Tune Measurement | Santana, Michael | B | 2 | 1/6/2012 |
| LS-OPM-0006 | 10/30/2003 | Accelerator Operator Manual - VUV Global Orbit Correction | Santana, Michael | B | 2 | 11/8/2011 |
| LS-OPM-0007 | 5/11/2010 | X-Ray Ring Injection Process (Initial Start-Up) | Santana, Michael | H | 2 | 6/6/2012 |
| LS-OPM-0008 | 2/22/2002 | VUV Insertion Device Adjustments with Stored Beam | Hidaka, Yoshiteru | D | 2 | 6/6/2012 |
| LS-OPM-0009 | 10/23/2000 | Accelerator Operator Manual - VUV Softramps | Santana, Michael | B | 2 | 9/28/2010 |
| LS-OPM-0010 | 5/11/2010 | X-Ray Injection Process (Operation Mode) | Santana, Michael | F | 2 | 6/6/2012 |
| LS-OPM-0011 | 3/11/2002 | X-Ray Global Orbit Correction (High Energy) | Santana, Michael | C | 2 | 6/6/2012 |
| LS-OPM-0012 | 4/27/2002 | X13 Mini Gap Undulator (MGU) (Accelerator Operator Manual) | Santana, Michael | C | 2 | 6/6/2012 |
| LS-OPM-0013 | 10/23/2000 | Accelerator Operator Manual - X-Ray Softramps | Santana, Michael | C | 2 | 9/28/2010 |
| LS-OPM-0016 | 7/1/2001 | Accelerator Operator Manual - X-Ray Tune Measurement | Santana, Michael | B | 2 | 7/11/2011 |
| LS-OPM-0017 | 1/14/2000 | VUV Tune Correction | Santana, Michael | A | 2 | 1/6/2012 |
| LS-OPM-0019 | 2/19/2002 | RF - Troubleshooting VUVRF | Ramirez, Gloria | B | 2 | 9/29/2010 |
| LS-OPM-0020 | 2/10/2006 | XRF2A Phase Lock Loop Error | Ramirez, Gloria | C | 2 | 9/29/2010 |
| LS-OPM-0021 | 2/10/2006 | VUV Compressed Bunch Operations | Ramirez, Gloria | C | 2 | 9/29/2010 |
| LS-OPM-0022 | 2/10/2006 | VUVRF2 Passive/Powered/Detuned Operations | Ramirez, Gloria | C | 2 | 9/29/2010 |
| LS-OPM-0024 | 7/26/2007 | Accelerator Operator Manual - X-Ray Global & Local Orbit Correction Request | Santana, Michael | C | 2 | 6/27/2011 |
| LS-OPM-0025 | 2/19/2002 | XRF1 Low Pressure Copper Resistivity Auxiliary Sensor | Ramirez, Gloria | B | 2 | 9/29/2010 |
| LS-OPM-0028 | 3/27/2004 | Re-Homing (Calibrating) Undulator/Wiggler Gaps | Santana, Michael | C | 2 | 6/6/2012 |
| LS-OPM-0029 | 12/1/2004 | Creating Low Emittance Preclose Response Matrix | Santana, Michael | B | 2 | 11/4/2010 |
| LS-OPM-0030 | 6/6/2004 | XFR Penthouse Overtemp Alarm Response | Ramirez, Gloria | B | 2 | 12/13/2010 |
| LS-OPM-0031 | 7/5/2007 | X17SCW Magnet Power Supply On/Off Procedure | Santana, Michael | C | 2 | 4/27/2011 |
| LS-OPM-0032 | 8/17/2011 | X29 MGU Operation | Santana, Michael | B | 2 | 8/17/2011 |
| LS-OPM-0035 | 5/11/2010 | Automatic - Inject and Ramp to 2.584 and 2.801 GeV Operator Aid | Santana, Michael | A | 2 | 6/6/2012 |
| LS-OPS-0001 | 3/10/2010 | Securing the X-Ray Tunnel | Buckley, Michael | D | 3 | 3/10/2010 |
| LS-OPS-0002 | 2/24/2009 | Securing the VUV Ring | McDonald, Thomas | E | 3 | 6/13/2012 |
| LS-OPS-0003 | 7/18/2008 | Securing the LINAC/Booster Area | Buckley, Michael | C | 3 | 7/18/2008 |
| LS-OPS-0004 | 2/20/2003 | Caution (Yellow) Tags | Buckley, Michael | C | 5 | 2/6/2008 |
| LS-OPS-0005 | 4/10/2008 | Response to Emergencies at the NSLS (Operations Group Response) | Chmiel, Robert | K | 1 | 5/27/2011 |
| LS-OPS-0006 | 12/1/2008 | Response to BNL Site Alerts and Emergencies | Chmiel, Robert | E | 1 | 3/10/2011 |
| LS-OPS-0006A | 12/1/2008 | Response to BNL Site Alerts and Emergencies Addendum - Quick Reference | Chmiel, Robert | D | 1 | 3/10/2011 |
| LS-OPS-0007 | 1/21/2005 | NSLS Control Room Alarm System | Zeitler, Edward | C | 2 | 8/18/2011 |
| LS-OPS-0008 | 6/10/2004 | Beamline Padlock Log System | Buckley, Michael | 1 | 3 | 8/27/2010 |
| LS-OPS-0010 | 12/8/2004 | X-Ray Beamline Front-End Safety Shutter Malfunction | Santana, Michael | D | 3 | 2/15/2011 |
| LS-OPS-0011 | 1/10/2006 | Beam Line Attendance Requirements: Pink Cards | Chmiel, Robert | C | 3 | 3/31/2009 |
| LS-OPS-0012 | 8/18/2005 | VUV Injection Time Limits | Chmiel, Robert | B | 3 | 6/13/2012 |
| LS-OPS-0013 | 6/15/2010 | X-Ray Ring Plug Doors Procedure | Marino, Philip | E | 2 | 6/15/2010 |
| LS-OPS-0014 | 4/19/2010 | NSLS Machine Operating Limits | Santana, Michael | G | 3 | 4/19/2010 |
| LS-OPS-0017 | 1/11/2008 | Linac Modulator Emergency Response | Chmiel, Robert | C | 2 | 1/26/2010 |
| LS-OPS-0018 | 11/23/1999 | Building 725 Fire Alarm Response Guidebook | Chmiel, Robert | B | 3 | 4/8/2009 |
| LS-OPS-0020 | 1/24/2002 | Building 725 Remote Fire Alarm Panel Bell Delay | Chmiel, Robert | B | 2 | 3/1/2010 |
| LS-OPS-0021 | 3/8/2010 | Operations Coordinator Handbook | Marino, Philip | D | 3 | 3/8/2010 |
| LS-OPS-0022 | 8/10/2008 | Control Room Communications on BNL Fire Group Radio Frequency | Klug, John | C | 2 | 6/20/2012 |
| LS-OPS-0024 | 9/26/2007 | Monitoring of the X17 Superconducting Wiggler Cryogenic | Freudenburg, Richard | B | 5 | 9/26/2007 |
| LS-OPS-0025 | 1/8/2008 | X-Ray Current Limits | Santana, Michael | B | 2 | 11/18/2011 |
| LS-OPS-0026 | 8/10/2008 | Weekly Fire Radio Check on BNL Fire Group Frequency | Klug, John | B | 2 | 6/20/2012 |
| LS-OPS-0027 | 6/10/2011 | Response to Botulism Toxcin Experiment Emergencies | Stiegler, Lori | C | 3 | 6/10/2011 |
| LS-OPS-0028 | 1/19/2007 | Procedure for preparing the X-Ray ring for Maintenance | Santana, Michael | B | 2 | 2/15/2011 |
| LS-OPS-0029 | 10/20/2009 | NSLS VUV RF Smoke Detector Response | Ramirez, Gloria | C | 1 | 2/22/2012 |
| LS-OPS-0030 | 10/20/2009 | NSLS X-Ray RF Smoke Detector Response | Ramirez, Gloria | D | 1 | 10/12/2011 |
| LS-OPS-0031 | 4/15/2010 | Vacuum Procedures for Beamline U7A | Hulbert, Steve | D | 3 | 4/15/2010 |
| LS-OPS-0033 | 6/19/2001 | Work in Areas Subject to Radiation from VUV Injection | Chmiel, Robert | A | 2 | 6/25/2010 |
| LS-OPS-0034 | 8/1/2001 | Vacuum Procedures for Beamline X-12A | Siddons, Peter | B | 2 | 8/8/2011 |
| LS-OPS-0035 | 10/29/2001 | Vacuum Procedures for Beamline X-6A | Stojanoff, Vivian | B | 3 | 12/14/2010 |
| LS-OPS-0036 | 11/1/2001 | Vacuum Procedures for Beamline X-26C | Schneider, Dieter | B | 3 | 3/9/2011 |
| LS-OPS-0037 | 11/20/2009 | Vacuum Procedures for Beamline U-1A | Hulbert, Steve | C | 3 | 11/20/2009 |
| LS-OPS-0038 | 1/1/2002 | Vacuum Procedures for Beamline U2A | Liu, Zhenxian | B | 3 | 8/8/2011 |
| LS-OPS-0040 | 1/1/2002 | Vacuum Procedures for Beamline U3C | Klug, John | B | 3 | 11/10/2010 |
| LS-OPS-0041 | 8/5/2010 | Vacuum Procedures for Beamline U4A | Hulbert, Steve | C | 3 | 8/5/2010 |
| LS-OPS-0042 | 12/8/2011 | Vacuum Procedures for Beamline U2B | Hu, Jih-Perng | C | 3 | 12/8/2011 |
| LS-OPS-0043 | 1/18/2002 | Vacuum Procedures for Beamline X1B | Hulbert, Steve | B | 3 | 3/1/2011 |
| LS-OPS-0044 | 1/31/2002 | Vacuum Procedures for Beamline X12C | Sclafani, S. | B | 3 | 11/12/2009 |
| LS-OPS-0045 | 2/15/2002 | Vacuum Procedures for Beamline X10C | Fareria, Larry | B | 3 | 11/9/2010 |
| LS-OPS-0046 | 12/8/2011 | Vacuum Procedures for Beamline X21B | Hu, Jih-Perng | C | 3 | 12/8/2011 |
| LS-OPS-0047 | 7/27/2007 | Transuranic Materials Experiment; Operations Response to Emergencies | Stiegler, Lori | C | 3 | 8/20/2010 |
| LS-OPS-0048 | 4/15/2010 | Vacuum Procedures for Beamline U4B | Hulbert, Steve | D | 3 | 4/15/2010 |
| LS-OPS-0049 | 12/19/2008 | Oxygen Deficiency Hazard (ODH) Alarms in Bldg. 725 | Ackerman, Andrew | E | 3 | 12/19/2008 |
| LS-OPS-0050 | 2/13/2004 | Vacuum Procedures for Beamline U5UA | Vescovo, Elio | C | 3 | 1/22/2007 |
| LS-OPS-0051 | 1/27/2010 | User Waste Generation Notification | Klaus, Keith | D | 3 | 1/27/2010 |
| LS-OPS-0052 | 3/1/2010 | Requirements for Working in the X-Ray Tunnel | Zafonte, Frank | C | 3 | 3/1/2010 |
| LS-OPS-0053 | 6/19/2008 | Vacuum Procedures for Beamline U-7B | Hulbert, Steve | C | 3 | 5/23/2011 |
| LS-OPS-0055 | 12/11/2005 | Vacuum Procedures for Beamline U-9B | Trunk, John | C | 3 | 1/5/2012 |
| LS-OPS-0056 | 1/13/2006 | Vacuum Procedures for Beamline X11-B | Karlin, Barry | C | 3 | 12/16/2011 |
| LS-OPS-0057 | 9/25/2002 | Fire Alarm Testing Public Address Anouncement | Klug, John | A | 2 | 11/19/2010 |
| LS-OPS-0058 | 11/15/2002 | Vacuum Procedures for Beamline X-6B | Stanic, Vesna | B | 3 | 1/4/2012 |
| LS-OPS-0059 | 5/23/2003 | Vacuum Procedures for Beamline X-17C | Hu, Jingzhu | B | 3 | 4/9/2009 |
| LS-OPS-0061 | 7/11/2003 | Vacuum Procedures for Beamline U13UB | Hulbert, Steve | B | 3 | 6/9/2009 |
| LS-OPS-0062 | 2/20/2003 | Vacuum Procedures for Beamline X-19A | Klug, John | B | 3 | 3/30/2009 |
| LS-OPS-0063 | 4/4/2003 | Vacuum Procedures for Beamline X-17B1, B2, & B3 | Zhong, Zhong | B | 3 | 11/10/2009 |
| LS-OPS-0064 | 4/17/2012 | Vacuum Procedures for Beamline U-8B | Marino, Philip | C | 3 | |
| LS-OPS-0065 | 12/22/2003 | Vacuum Procedures for Beamline X29 | Sullivan, Michael | A | 3 | 1/15/2010 |
| LS-OPS-0068 | 1/10/2007 | List of Approved Venters of Beamline U7A Sect. IX C without OPCO Presence | Hulbert, Steve | B | 3 | 4/6/2010 |
| LS-OPS-0069 | 4/6/2004 | Vacuum Procedures for Beamlie X21A | Lamarra, Steven | B | 3 | 3/3/2010 |
| LS-OPS-0073 | 12/12/2007 | Vacuum Procedures for Beamline X-8A | Keister, Jeffrey | D | 3 | 11/4/2010 |
| LS-OPS-0074 | 6/30/2008 | Vacuum Procedures for Beamline X-8C | Dvorak, Joseph | C | 3 | 8/3/2011 |
| LS-OPS-0075 | 8/17/2011 | Vacuum Procedures for Beamline X1A | Starr, David | E | 3 | 8/17/2011 |
| LS-OPS-0076 | 6/15/2006 | Vacuun Procedures for Beamline X13A | Sanchez Hanke, Cecilia | D | 3 | 6/23/2009 |
| LS-OPS-0078 | 10/19/2009 | Vacuum Procedures for Beamline X24A | Karlin, Barry | D | 3 | 10/19/2009 |
| LS-OPS-0079 | 9/29/2004 | Vacuum Procedures for Beamline U-15A | Hulbert, Steve | B | 3 | 3/1/2011 |
| LS-OPS-0080 | 2/11/2010 | Vacuum Procedures for Beamline X-27A | Nintzel, Gary | D | 3 | 2/11/2010 |
| LS-OPS-0081 | 1/28/2005 | Vacuum Procedures for Beamline X-24C | Kjornrattanawanich, B. | B | 3 | 12/23/2010 |
| LS-OPS-0082 | 4/11/2005 | Vacuum Procedures for Beamline X-23A2 | Karlin, Barry | B | 3 | 4/21/2011 |
| LS-OPS-0083 | 6/29/2005 | Vacuum Procedures for Beamline X-13B | Hulbert, Steve | B | 3 | 9/22/2011 |
| LS-OPS-0084 | 9/24/2009 | Vacuum Procedures for Beamline X16C | Hulbert, Steve | C | 3 | 9/24/2009 |
| LS-OPS-0085 | 5/26/2005 | MOU Between NSLS & EP Site Shift Supervisors Responding to LS Calls (Call-in list) | Kiss, Robert | A | 3 | 8/19/2008 |
| LS-OPS-0086 | 3/24/2008 | Vacuum Procedures for Beamline U-12A | Hulbert, Steve | C | 3 | 3/3/2011 |
| LS-OPS-0087 | 3/3/2011 | X-Ray Ring Plug Doors Procedure for X29 & X30 | Marino, Philip | B | 2 | 3/3/2011 |
| LS-OPS-0088 | 3/13/2009 | Vacuum Procedures for Beamline X28C (note: John Klug is a reviewer of this doc.) | Sullivan, Michael | C | 3 | 6/6/2012 |
| LS-OPS-0090 | 3/14/2006 | Vacuum Procedures for Beamline X-16B | Nelson, Christie | B | 3 | 2/5/2009 |
| LS-OPS-0092 | 4/25/2007 | Machine Startup/Shutdown Checklist | Santana, Michael | B | 2 | 6/27/2011 |
| LS-OPS-0093 | 7/26/2006 | Vacuum Procedures for Beamline X-20B | jordan-sweet, jean | B | 3 | 6/8/2012 |
| LS-OPS-0094 | 8/17/2006 | Vacuum Procedures for Beamline X-3B | Sullivan, Michael | B | 3 | 6/6/2012 |
| LS-OPS-0095 | 8/18/2006 | Vacuum Procedures for Beamline X3A | Sullivan, Michael | B | 3 | 6/6/2012 |
| LS-OPS-0096 | 7/31/2009 | Operations Group Response to Chipmunk Monitor data on NSLS Video Channel 28 | Stiegler, Lori | 2 | 3 | 7/31/2009 |
| LS-OPS-0098 | 1/4/2007 | Vacuum Procedures for Beamline X27C | Rong, L. | B | 3 | 11/12/2009 |
| LS-OPS-0099 | 1/4/2007 | Vacuum Procedures for Beamline X18B | Khalid, Syed | B | 3 | 2/17/2010 |
| LS-OPS-0100 | 4/14/2008 | Vacuum Procedures for Beamline X7B | Hanson, Jonathan | C | 3 | 2/22/2011 |
| LS-OPS-0101 | 1/8/2008 | VUV Ring Current Limits | Santana, Michael | B | 2 | 11/18/2011 |
| LS-OPS-0102 | 3/20/2007 | Vacuum Procedures for Beamline X-25A | Lamarra, Steven | B | 3 | 3/3/2010 |
| LS-OPS-0103 | 3/24/2011 | NSLS Emergency Call-In List | Zitvogel, Emil | H | 1 | 3/24/2011 |
| LS-OPS-0104 | 1/22/2010 | Enabling NSLS X-Ray Beamlines | Marino, Philip | C | 1 | 3/29/2011 |
| LS-OPS-0105 | 1/22/2010 | Enabling NSLS VUV Beamlines | Marino, Philip | C | 1 | 3/29/2011 |
| LS-OPS-0106 | 1/22/2010 | Vacuum Bleedups on NSLS Beamline | Marino, Philip | B | 1 | 3/29/2011 |
| LS-OPS-0108 | 1/25/2010 | Opening and Closing NSLS Beamline Front Ends | Marino, Philip | B | 1 | 3/27/2011 |
| LS-OPS-0109 | 3/8/2011 | Posting Safety Approval Forms Using PASS | Marino, Philip | C | 1 | 3/8/2011 |
| LS-OPS-0110 | 3/1/2010 | Maintenance Management Program | Santana, Michael | B | 3 | 3/1/2010 |
| LS-OPS-0112 | 5/1/2011 | NSLS RF and Power Systems Group Emergency Call-In List | Ramirez, Gloria | D | 1 | 6/6/2012 |
| LS-OPS-0113 | 4/22/2011 | SDL Emergency Call-In List | Heese, Richard | C | 1 | 4/22/2011 |
| LS-OPS-0114 | 3/13/2008 | Vacuum Procedures for Beamline X18A | Ehrlich, Steve | B | 3 | 2/15/2011 |
| LS-OPS-0115 | 11/3/2008 | Vacuum Procedures for Beamline X-9A | Yang, Lin | A | 3 | 10/12/2011 |
| LS-OPS-0116 | 12/22/2008 | Vacuum Procedures for Beamline X-16A | Cai, Y | A | 3 | 11/17/2011 |
| LS-OPS-0117 | 1/12/2009 | X-Ray Equipment Area Temperature Alarm - Response | Ramirez, Gloria | A | 1 | 6/6/2012 |
| LS-OPS-0120 | 7/13/2010 | Response to Computer Room HVAC Alarms | Buckley, Michael | B | 3 | 7/13/2010 |
| LS-OPS-0121 | 2/10/2010 | Vacuum Procedures for Beamline U-4IR | Carr, Larry | B | 3 | 2/10/2010 |
| LS-OPS-0122 | 2/10/2010 | Vacuum Procedures for Beamline U-10B | Carr, Larry | B | 3 | 2/10/2010 |
| LS-OPS-0123 | 1/4/2010 | Vacuum Procedures for Beamline U-11 | Trunk, John | B | 3 | 1/4/2010 |
| LS-OPS-0124 | 2/22/2010 | Vacuum Procedures for Beamline U-12IR | Carr, Larry | B | 3 | 2/22/2010 |
| LS-OPS-0125 | 5/25/2011 | NSLS Mechanical System Group Emergency Call-In List | Mortazavi, Payman | C | 1 | 5/25/2011 |
| LS-OPS-0126 | 4/9/2010 | Control Room Response to a Modulator Integrated Current Detector Interlock Trip | Santana, Michael | A | 1 | 6/6/2012 |
| LS-OPS-0127 | 5/11/2010 | Response to Operation Problems Due to Network Malfunctioning | Santana, Michael | A | 1 | 6/6/2012 |
| LS-OPS-0128 | 4/20/2010 | Qualified NSLS Operations Coordinators | Santana, Michael | C | 3 | 4/20/2010 |
| LS-OPS-0129 | 4/20/2010 | Qualified NSLS Accelerator Operators | Santana, Michael | B | 3 | 4/20/2010 |
| LS-OPS-0130 | 6/2/2010 | Vacuum Procedures for Beamline X-2B | Fareria, Larry | B | 3 | 6/2/2010 |
| LS-OPS-0131 | 6/10/2010 | Vacuum Procedures for Beamline X4A | Abramowitz, Randy | B | 3 | 6/10/2010 |
| LS-OPS-0132 | 6/10/2010 | Vacuum Procedures for Beamline X4C | Abramowitz, Randy | B | 3 | 6/10/2010 |
| LS-OPS-0133 | 8/5/2010 | Vacuum Procedures for Beamline X7A | Greene, Richard | B | 3 | 8/5/2010 |
| LS-OPS-0134 | 9/1/2010 | Vacuum Procedures for Beamline X-10A | Bennett, Steve | B | 3 | 9/1/2010 |
| LS-OPS-0135 | 9/1/2010 | Vacuum Procedures for Beamline X-10B | Bennett, Steve | B | 3 | 9/10/2010 |
| LS-OPS-0136 | 12/1/2010 | Vacuum Procedures for Beamline X-17A | Lamarra, Steven | A | 3 | 12/1/2010 |
| LS-OPS-0137 | 2/23/2011 | Vacuum Procedures for Beamline X11A | Pandya, Kaumudi | B | 3 | 2/23/2011 |
| LS-OPS-0138 | 1/6/2011 | NSLS LBD2 Magnet Shunt Switch Procedure | Ramirez, Gloria | A | 2 | 1/6/2011 |
| LS-OPS-0139 | 3/15/2011 | Vacuum Procedures for Beamline X14A | Bai, Jianming | B | 3 | 3/15/2011 |
| LS-OPS-0140 | 3/15/2011 | Vacuum Procedures for Beamline X26A | Wirick, Sue | B | 3 | 3/15/2011 |
| LS-OPS-0141 | 4/12/2011 | Vacuum Procedures for Beamline X15A | Zhong, Zhong | B | 3 | 4/12/2011 |
| LS-OPS-0142 | 6/27/2011 | Vacuum Procedures for Beamline X15B | Northrup, Paul | B | 3 | 6/27/2011 |
| LS-OPS-0143 | 4/14/2011 | Procedure for Off Hours Filling of X13A Chamber with LN2 in Building 726 | Chmiel, Robert | 1 | 2 | 4/14/2011 |
| LS-OPS-0144 | 5/5/2011 | Vacuum Procedures for Beamline X19C | Raghothamachar, Balaji | B | 3 | 5/5/2011 |
| LS-OPS-0145 | 8/22/2011 | Vacuum Procedures for Beamline X20A | jordan-sweet, jean | B | 3 | 8/22/2011 |
| LS-OPS-0146 | 8/22/2011 | Vacuum Procedures for Beamline X20C | jordan-sweet, jean | B | 3 | 8/22/2011 |
| LS-OPS-0147 | 7/25/2011 | NSLS Control Room Safety Spare Keys Cabinet Access | McDonald, Thomas | 1 | 1 | 7/25/2011 |
| LS-OPS-0151 | 2/28/2012 | Vacuum Procedures for Beamline X-27B | Klug, John | B | 3 | 2/28/2012 |
| LS-OPS-0152 | 4/23/2012 | Yang, Lin | B | 3 | 4/23/2012 | |
| LS-PCL-0003 | 12/8/2010 | X2B Padlock Index | Marino, Philip | B | 3 | 12/8/2010 |
| LS-PCL-0004 | 12/15/2010 | X3A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0005 | 12/15/2010 | X3B Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0008 | 5/6/2010 | X4A Padlock Index | Marino, Philip | B | 3 | 5/6/2010 |
| LS-PCL-0009 | 12/15/2010 | X4C Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0011 | 12/15/2010 | X6A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0012 | 12/15/2010 | X6B Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0013 | 12/15/2010 | X7A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0014 | 6/27/2011 | X7B Padlock Index | Marino, Philip | D | 3 | 6/27/2011 |
| LS-PCL-0015 | 12/15/2010 | X8A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0016 | 1/11/2011 | X8C Padlock Index | Marino, Philip | B | 3 | 1/11/2011 |
| LS-PCL-0017 | 4/17/2012 | X9A Padlock Index | Marino, Philip | C | 3 | 2/28/2012 |
| LS-PCL-0019 | 12/15/2010 | X10A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0020 | 12/15/2010 | X10B Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0021 | 12/15/2010 | X10C Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0022 | 12/15/2010 | X11A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0023 | 12/15/2010 | X11B Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0024 | 5/6/2010 | X12A Padlock Index | Marino, Philip | C | 3 | 5/6/2010 |
| LS-PCL-0025 | 5/6/2010 | X12B Padlock Index | Marino, Philip | B | 3 | 5/6/2010 |
| LS-PCL-0026 | 12/15/2010 | X12C Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0028 | 8/25/2010 | X13B Padlock Index | Marino, Philip | E | 3 | 8/25/2010 |
| LS-PCL-0029 | 12/15/2010 | X14A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0031 | 12/15/2010 | X15A Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0032 | 12/15/2010 | X15B Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0033 | 3/18/2009 | X16A Padlock Index | McDonald, Thomas | A | 3 | 3/18/2009 |
| LS-PCL-0034 | 12/15/2010 | X16B Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0035 | 12/15/2010 | X16C Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0037 | 11/1/2010 | X17B Padlock Index | Marino, Philip | C | 3 | 11/1/2010 |
| LS-PCL-0039 | 1/13/2010 | X17C Padlock Index | Marino, Philip | B | 3 | 1/13/2010 |
| LS-PCL-0040 | 6/27/2011 | X18A Padlock Index | Marino, Philip | E | 3 | 6/27/2011 |
| LS-PCL-0041 | 12/15/2010 | X18B Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0043 | 5/6/2010 | X19C Padlock Index | Marino, Philip | B | 3 | 5/6/2010 |
| LS-PCL-0044 | 12/15/2010 | X20A Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0045 | 1/25/2010 | X20B Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0046 | 12/15/2010 | X20C Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0047 | 1/6/2010 | X21A Padlock Index | Marino, Philip | D | 3 | 1/6/2010 |
| LS-PCL-0048 | 1/25/2010 | X22A Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0049 | 1/25/2010 | X22B Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0050 | 1/25/2010 | X22C Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0051 | 12/15/2010 | X23A2 Padlock Index | Marino, Philip | D | 3 | 12/15/2010 |
| LS-PCL-0053 | 1/25/2010 | X23B Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0056 | 1/6/2010 | X25A Padlock Index | Marino, Philip | E | 3 | 1/6/2010 |
| LS-PCL-0057 | 1/25/2010 | X26A Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0058 | 1/25/2010 | X26C Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0059 | 12/15/2010 | X27A Padlock Index | Marino, Philip | E | 3 | 12/15/2010 |
| LS-PCL-0060 | 12/15/2010 | X27C Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0061 | 1/25/2010 | X27C Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0062 | 12/15/2010 | X28B Padlock Index | Marino, Philip | B | 3 | 12/15/2010 |
| LS-PCL-0063 | 12/15/2010 | X28C Padlock Index | Marino, Philip | C | 3 | 12/15/2010 |
| LS-PCL-0086 | 1/25/2010 | X29A Padlock Index | Marino, Philip | B | 3 | 1/25/2010 |
| LS-PCL-0087 | 11/1/2010 | X17A Padlock Index | Marino, Philip | A | 3 | 11/1/2010 |
| LS-PCL-0088 | 9/12/2011 | X1A1 Padlock Index | Marino, Philip | A | 3 | 9/12/2011 |
| LS-PL-Call-In-0001 | 2/17/2004 | Emergency Electrician Call-In List | Boerner, Albert | A | 2 | 10/13/2011 |
| LS-PPS-0001 | 4/16/2002 | X-Ray Injection Warning Sign Test | Buckley, Michael | A | 3 | 3/25/2011 |
| LS-PPS-0002 | 3/20/2006 | General Beamline Radiological Interlock Test | McDonald, Thomas | C | 3 | 6/13/2012 |
| LS-PPS-0003 | 4/14/2009 | X20A Radiological Interlock Test | McDonald, Thomas | D | 3 | 6/13/2012 |
| LS-PPS-0004 | 3/7/2002 | X15B Beamline Radiological Interlock Test (Hutch Mode) | Buckley, Michael | A | 3 | 3/25/2011 |
| LS-PPS-0005 | 3/22/2011 | X17B1 Radiological Interlock Test | Buckley, Michael | H | 3 | 3/22/2011 |
| LS-PPS-0006 | 12/14/2010 | X17C Radiological Interlock Test | Buckley, Michael | E | 3 | 12/14/2010 |
| LS-PPS-0007 | 3/22/2011 | X17 Transport Hutch Radiological Interlock Test | Buckley, Michael | E | 3 | 3/22/2011 |
| LS-PPS-0010 | 1/22/2009 | Hutchless Beamline Radiological Interlock Test | McDonald, Thomas | C | 3 | 6/13/2012 |
| LS-PPS-0013 | 4/23/2010 | LINAC Booster Radiological Interlock Test | Buckley, Michael | H | 3 | 4/23/2010 |
| LS-PPS-0014 | 12/25/2011 | SDL Radiological Interlock Test | McDonald, Thomas | G | 3 | 12/25/2011 |
| LS-PPS-0015 | 3/30/2010 | SDL Linac/MHL Laser Interlock Test | Buckley, Michael | i | 3 | 3/30/2010 |
| LS-PPS-0016 | 6/10/2004 | Booster Operation Warning Sign Test | Buckley, Michael | C | 3 | 7/21/2010 |
| LS-PPS-0017 | 4/16/2002 | X1A Radiological Interlock Test | Buckley, Michael | A | 3 | 3/25/2011 |
| LS-PPS-0022 | 1/5/2009 | VUV Ring Radiological Interlock Test | McDonald, Thomas | H | 3 | 6/13/2012 |
| LS-PPS-0023 | 5/26/2011 | X-Ray Ring Radiological Interlock Test | Buckley, Michael | L | 3 | 5/26/2011 |
| LS-PPS-0024 | 9/21/2010 | X-Ray Ring Interlock Chain Isolation Test | Buckley, Michael | D | 3 | 9/21/2010 |
| LS-PPS-0025 | 1/6/2006 | U14B Radiological Interlock Test | McDonald, Thomas | C | 3 | 6/13/2012 |
| LS-PPS-0026 | 6/14/2002 | X-Ray Beamline Interlock Reach Back Test | McDonald, Thomas | A | 3 | 6/13/2012 |
| LS-PPS-0027 | 6/14/2002 | X14B Radiological Interlock Test | Buckley, Michael | A | 3 | 9/10/2008 |
| LS-PPS-0030 | 4/7/2005 | SDL Modulator High Voltage Power Supply Interlock Test Procedure | Orr, Ewart | B | 3 | 4/22/2011 |
| LS-PPS-0031 | 3/17/2003 | NSLS Modulator High Voltage Power Supply Interlock Test Procedure | McDonald, Thomas | A | 3 | 6/13/2012 |
| LS-PPS-0032 | 12/21/2010 | X17B2 Radiological Interlock Test | Buckley, Michael | E | 3 | 12/21/2010 |
| LS-PPS-0033 | 5/24/2011 | X17B3 Radiological Interlock Test | Buckley, Michael | E | 3 | 5/24/2011 |
| LS-PPS-0034 | 6/20/2003 | X28C Radiological Interlock Test | Buckley, Michael | A | 3 | 5/3/2010 |
| LS-PPS-0035 | 1/23/2007 | U2A Laser Interlock Test | Buckley, Michael | C | 3 | 5/3/2010 |
| LS-PPS-0036 | 5/4/2007 | U6 Laser Interlock Test | Buckley, Michael | B | 3 | 5/3/2010 |
| LS-PPS-0037 | 6/1/2011 | Interlock Test Personnel Call-In List | Chmiel, Robert | D | 1 | 6/13/2012 |
| LS-PPS-0039 | 4/5/2006 | X21A1/A3 Radiological Interlock Test | McDonald, Thomas | B | 3 | 6/13/2012 |
| LS-PPS-0040 | 12/11/2009 | SDL End Station Laser Area Interlock Test | McDonald, Thomas | C | 2 | 6/13/2012 |
| LS-PPS-0041 | 6/22/2006 | X13B Beamline Radiological Interlock Test | Buckley, Michael | A | 3 | 5/3/2010 |
| LS-PPS-0043 | 5/1/2007 | U13 Laser Interlock Test | Buckley, Michael | A | 3 | 5/3/2010 |
| LS-PPS-0044 | 10/12/2009 | X9A Beamline Radiological Interlock Test | Buckley, Michael | B | 3 | 10/12/2009 |
| LS-PPS-0045 | 6/2/2009 | X21A1 Laser Interlock Test | McDonald, Thomas | A | 3 | 6/13/2012 |
| LS-PPS-0046 | 5/4/2011 | X17B3 Laser Interlock Test | Buckley, Michael | B | 3 | 5/4/2011 |
| LS-PPS-0047 | 12/14/2010 | X17A Radiological Interlock Test | Buckley, Michael | A | 3 | 12/14/2010 |
| LS-PSG-M002 | 5/15/2010 | NSLS Klystron Modulator Mantenance Procedure | Ramirez, Gloria | B | 2 | 6/6/2012 |
| LS-PSG-S001 | 11/22/2010 | NSLS Modulator PFN Tuning Procedure | Ramirez, Gloria | D | 2 | 11/22/2010 |
| LS-PSG-S002 | 6/15/2011 | NSLS Modulator High Voltage LOTO | Ramirez, Gloria | F | 2 | 6/15/2011 |
| LS-PSG-S003 | 5/15/2010 | NSLS Main Magnet Power Supply LOTO | Ramirez, Gloria | E | 2 | 5/15/2010 |
| LS-PSG-S004 | 5/15/2010 | NSLS Transfer Line Magnet Power Supply LOTO | Ramirez, Gloria | E | 2 | 5/15/2010 |
| LS-PSG-S005 | 5/15/2010 | NSLS Pulsed Magnet LOTO | Ramirez, Gloria | D | 2 | 5/15/2010 |
| LS-PSG-S006 | 5/15/2010 | NSLS XQD Trim Rack Access | Ramirez, Gloria | C | 2 | 5/15/2010 |
| LS-PSG-S009 | 5/15/2010 | NSLS Linac Pump Station LOTO | Ramirez, Gloria | C | 2 | 5/15/2010 |
| LS-PSG-S010 | 5/15/2010 | NSLS EPW LOTO | Ramirez, Gloria | C | 2 | 5/15/2010 |
| LS-PSG-S012 | 5/15/2010 | NSLS Kicker Lab Pulsed Magnet Test Procedure | Zuhoski, Peter | B | 2 | 5/15/2010 |
| LS-PSG-T001 | 5/15/2010 | NSLS Ring Access for Magnet Measurements | Ramirez, Gloria | D | 1 | 5/25/2011 |
| LS-PSG-T002 | 5/15/2010 | Hi-Potting NSLS Ring Magnets | Ramirez, Gloria | D | 2 | 5/15/2010 |
| LS-PSG-T003 | 12/15/2010 | XQD Trim Bench Test | Ramirez, Gloria | D | 5 | 12/15/2010 |
| LS-PSG-T004 | 2/10/2005 | XQD Trim Installation Checkout Procedure | Zuhoski, Peter | D | 5 | 4/9/2010 |
| LS-PSG-T005 | 5/15/2010 | NSLS Kicker Test Procedure - In Place | Ramirez, Gloria | C | 2 | 5/15/2010 |
| LS-PSG-T006 | 10/30/2007 | Kicker Lab Interlock Test Checklist | Zuhoski, Peter | B | 3 | 12/16/2010 |
| LS-PSG-T007 | 5/15/2010 | In Place Booster Kicker Test With LINAC Booster Security | Ramirez, Gloria | C | 2 | 5/15/2010 |
| LS-PSG-T008 | 3/23/2009 | NSLS Modulator Emergency Stop Test Procedure | Ramirez, Gloria | A | 1 | 10/12/2011 |
| LS-PSG-T009 | 11/22/2010 | NSLS Modulator Smoke Detector Test | Ramirez, Gloria | B | 2 | 11/22/2010 |
| LS-PSG-T010 | 5/20/2009 | NSLS Modulator PFN Arc Detector Test Procedure | Ramirez, Gloria | A | 1 | 10/12/2011 |
| LS-QAP-0417 | 3/29/2010 | Installation Readiness Review | Buckley, Michael | A | 3 | 3/29/2010 |
| LS-QAP-0802 | 12/6/2006 | NSLS Family Assessment Tracking System Instructions | Buckley, Michael | D | 3 | 5/3/2010 |
| LS-RF-0001 | 10/10/2010 | Preventative Maintenance Procedure for 3kW Amplifiers | Ramirez, Gloria | E | 2 | 10/10/2010 |
| LS-RF-0002 | 10/10/2010 | Preventative Maintenance Procedure for 50kW Amplifier | Ramirez, Gloria | E | 2 | 10/10/2010 |
| LS-RF-0003 | 10/10/2010 | Preventative Maintenance Procedure - Cord/Plug Connected RF Equipment | Ramirez, Gloria | C | 2 | 10/10/2010 |
| LS-RF-0004 | 10/10/2010 | Preventative Maintenance Procedure for NSLS RF 125kW Amplifier | Ramirez, Gloria | E | 2 | 10/10/2010 |
| LS-RF-0005 | 10/10/2010 | Preventative Maintenance Procedure for 3kW Amplifier Plate | Ramirez, Gloria | E | 2 | 10/10/2010 |
| LS-RF-0006 | 10/10/2010 | Preventative Maintenance Procedure for 50kW and 125kW Amplifier Plate Power Supplies | Ramirez, Gloria | E | 2 | 10/10/2010 |
| LS-RF-0007 | 7/1/2002 | Preventive Maintenance Procedure for RF Cavity Security Gates System | Ramirez, Gloria | A | 1 | 2/22/2012 |
| LS-RF-0011 | 11/20/2010 | NSLS RF System 3Kw Amplifier LOTO | Ramirez, Gloria | H | 2 | 11/20/2010 |
| LS-RF-0012 | 10/20/2009 | NSLS RF System 3KW Amplifier Plate Power Supply LOTO | Ramirez, Gloria | E | 2 | 11/22/2010 |
| LS-RF-0015 | 10/20/2009 | NSLS RF System 50KW Amplifier LOTO | Ramirez, Gloria | F | 2 | 11/19/2010 |
| LS-RF-0016 | 10/20/2009 | NSLS RF System 50 KW Amplifier Plate Power Supply LOTO | Ramirez, Gloria | F | 2 | 11/19/2010 |
| LS-RF-0017 | 11/20/2010 | NSLS RF System 125Kw Amplifier LOTO | Ramirez, Gloria | F | 2 | 11/20/2010 |
| LS-RF-0018 | 10/20/2009 | NSLS RF System 125kw Amplifier Plate Power Supply LOTO | Ramirez, Gloria | F | 2 | 11/19/2010 |
| LS-RF-0019 | 10/20/2009 | NSLS RF System Coax Work LOTO | Ramirez, Gloria | C | 1 | 12/7/2011 |
| LS-RF-0020 | 9/18/2003 | Re-Certification of XRF Test Area ("Blockhouse") Security Interlock System | Ramirez, Gloria | A | 1 | 10/12/2011 |
| LS-RF-0021 | 9/18/2003 | Operations of XRF Test System when loaded by an RF Cavity | Ramirez, Gloria | A | 1 | 2/22/2012 |
| LS-RF-0024 | 4/7/2005 | Transformer Test Procedure (Hammond PT25QG) | Zuhoski, Peter | A | 2 | 9/1/2011 |
| LS-RF-0025 | 12/15/2010 | Eimac Tube Removal and Installation | Ramirez, Gloria | A | 2 | 12/15/2010 |
| LS-SCL-0001 | 5/6/2010 | X12A Safety Checklist | Marino, Philip | C | 3 | 5/6/2010 |
| LS-SCL-0002 | 5/6/2010 | X19A Safety Checklist | Marino, Philip | C | 3 | 5/6/2010 |
| LS-SCL-0003 | 9/11/2011 | X1A Safety Checklist | Marino, Philip | F | 3 | 9/11/2011 |
| LS-SCL-0004 | 8/5/2011 | X1B Safety Checklist | Jew, William | E | 3 | 8/5/2011 |
| LS-SCL-0005 | 5/6/2010 | X2B Safety Checklist | Marino, Philip | D | 3 | 5/6/2010 |
| LS-SCL-0009 | 10/24/2010 | X17A Beamline Safety Checklist | Marino, Philip | A | 3 | 10/24/2010 |
| LS-SCL-0010 | 5/6/2010 | X4A Safety Checklist | Marino, Philip | C | 3 | 5/6/2010 |
| LS-SCL-0011 | 5/6/2010 | X4C Safety Checklist | Marino, Philip | D | 3 | 5/6/2010 |
| LS-SCL-0013 | 5/6/2010 | X6A Safety Checklist | Marino, Philip | C | 3 | 5/6/2010 |
| LS-SCL-0014 | 5/6/2010 | X6B Safety Checklist | Marino, Philip | C | 3 | 5/6/2010 |
| LS-SCL-0015 | 5/24/2010 | X7A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0016 | 7/22/2011 | X7B Safety Checklist | Marino, Philip | E | 3 | 7/22/2011 |
| LS-SCL-0017 | 5/24/2010 | X8A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0018 | 1/10/2011 | X8C Safety Checklist | Marino, Philip | D | 3 | 1/10/2011 |
| LS-SCL-0019 | 6/16/2009 | X9A Safety Checklist | McDonald, Thomas | C | 3 | 6/8/2009 |
| LS-SCL-0021 | 5/24/2010 | X10A Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0022 | 5/24/2010 | X10B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0023 | 5/24/2010 | X10C Safety Checklist | Marino, Philip | C | 31 | 5/24/2010 |
| LS-SCL-0024 | 5/24/2010 | X11A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0025 | 5/24/2010 | X11B Safety Checkist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0026 | 5/24/2010 | X12B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0027 | 5/24/2010 | X12C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0028 | 5/24/2010 | X13A/B Safety Checklist | Marino, Philip | E | 3 | 5/10/2010 |
| LS-SCL-0030 | 5/24/2010 | X14A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0033 | 5/24/2010 | X15B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0034 | 4/13/2009 | X16A Safety Checklist | McDonald, Thomas | A | 3 | 4/13/2009 |
| LS-SCL-0035 | 5/24/2010 | X16B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0036 | 5/24/2010 | X16C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0037 | 5/24/2010 | X17B1 Safety Checklist | Marino, Philip | C | 3 | 5/20/2010 |
| LS-SCL-0038 | 7/22/2011 | X17B2 Safety Checklist | Marino, Philip | D | 3 | 5/24/2011 |
| LS-SCL-0039 | 5/24/2010 | X17B3 Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0040 | 5/24/2010 | X17C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0041 | 6/27/2011 | X18A Safety Checklist | Marino, Philip | D | 3 | 6/27/2011 |
| LS-SCL-0042 | 5/24/2010 | X18B Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0043 | 5/24/2010 | X19C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0044 | 5/24/2010 | X20A Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0045 | 5/24/2010 | X20B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0046 | 5/24/2010 | X20C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0047 | 5/24/2010 | X21A3 Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0048 | 3/31/2009 | X22A Safety Checklist | McDonald, Thomas | C | 3 | 3/31/2009 |
| LS-SCL-0049 | 5/24/2010 | X22B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0050 | 5/24/2010 | X22C Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0051 | 9/2/2009 | X23A2 Safety Checklist | Marino, Philip | F | 3 | 9/2/2009 |
| LS-SCL-0053 | 5/24/2010 | X23B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0054 | 5/24/2010 | X24A Safety Checklist | Marino, Philip | E | 3 | 5/24/2010 |
| LS-SCL-0055 | 5/24/2010 | X24C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0056 | 5/24/2010 | X25A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0057 | 5/24/2010 | X26A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0058 | 5/24/2010 | X26C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0059 | 5/24/2010 | X27A Safety Checklist | Marino, Philip | F | 3 | 5/24/2010 |
| LS-SCL-0060 | 5/24/2010 | X27C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0061 | 5/24/2010 | X27C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0062 | 5/24/2010 | X28B Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0063 | 9/15/2010 | X28C Safety Checklist | Marino, Philip | E | 3 | 9/15/2010 |
| LS-SCL-0064 | 5/24/2010 | U1A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0065 | 5/24/2010 | U2A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0066 | 5/24/2010 | U2B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0067 | 5/24/2010 | U3B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0068 | 5/24/2010 | U3C Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0069 | 5/24/2010 | U4A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0070 | 5/24/2010 | U4B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0071 | 5/24/2010 | U4IR Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0072 | 5/24/2010 | U5UA Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0073 | 5/24/2010 | U7A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCl-0074 | 5/24/2010 | U7B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0075 | 5/24/2010 | U8B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0077 | 5/24/2010 | U9B Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0078 | 5/24/2010 | U10A/B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0080 | 5/24/2010 | U11A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0081 | 5/24/2010 | U12A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0082 | 5/24/2010 | U12IR Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0083 | 5/24/2010 | U13UB Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0085 | 5/24/2010 | U15A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0086 | 5/24/2010 | X29A Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0087 | 5/24/2010 | X21A1 Safety Checklist | Marino, Philip | D | 3 | 5/24/2010 |
| LS-SCL-0088 | 5/24/2010 | U16B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0089 | 5/24/2010 | X3A Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SCL-0090 | 5/24/2010 | X3B Safety Checklist | Marino, Philip | C | 3 | 5/24/2010 |
| LS-SDL-0001 | 7/18/2006 | SDL Conduct of Operations | Buckley, Michael | B | 3 | 7/18/2006 |
| LS-SDL-0002 | 10/1/2010 | Source Development Laboratory (SDL) Safety Assessment Document (SAD) | Ackerman, Andrew | H | 5 | 10/1/2010 |
| LS-SDL-0003 | 2/5/2007 | The SDL Operator Training Certification Checklist | Wang, Xijie | C | 3 | 5/4/2010 |
| LS-SDL-0004 | 12/19/2008 | SDL Shielding Check List | Wang, Xijie | J | 3 | 12/19/2008 |
| LS-SDL-0005 | 10/22/2004 | SDL Search Procedure | Orr, Ewart | C | 5 | 12/13/2010 |
| LS-SDL-0006 | 10/22/2004 | SDL Radiation Interlock | Orr, Ewart | B | 3 | 2/22/2011 |
| LS-SDL-0007 | 10/22/2004 | SDL Laser Interlock | Orr, Ewart | C | 3 | 2/22/2011 |
| LS-SDL-0008 | 10/20/2009 | SDL Modulator High Voltage Lockout Tagout | Ramirez, Gloria | D | 2 | 10/12/2011 |
| LS-SDL-0009 | 12/19/2008 | RF Conditioning Checklist for DUV-FEL Linac Operation Bldg. 729 | Goel, Aditya | C | 3 | 12/19/2008 |
| LS-SDL-0010 | 6/1/2011 | SDL Crane/Clean Room Lock Procedure | Ramirez, Gloria | C | 3 | 6/1/2011 |
| LS-SDL-0011 | 10/20/2009 | SDL Linac Start-up/Shut-down Procedure | Ramirez, Gloria | B | 1 | 5/27/2011 |
| LS-SDL-0012 | 9/9/2002 | SDL Process Pumps Start-Up/Shut-down | Beauman, Ron | C | 5 | 7/26/2007 |
| LS-SDL-0013 | 2/4/2009 | Response to SDL Linac Modulator Malfunction | Goel, Aditya | C | 3 | 2/4/2009 |
| LS-SDL-0014 | 7/28/2009 | SDL Laser Safety Procedure | Shen, Yuzhen | C | 3 | 7/28/2009 |
| LS-SDL-0015 | 10/20/2009 | Work on Power Supply Powered by 208 VAC | Ramirez, Gloria | D | 1 | 10/12/2011 |
| LS-SDL-0016 | 10/21/2001 | SDL Enclosure Inspection Checklist | Johnson, Erik | B | 5 | 11/18/2011 |
| LS-SDL-0017 | 7/18/2006 | Shielding Inspection Procedure | Singh, Pooran | B | 3 | 7/27/2009 |
| LS-SDL-0019 | 9/23/2010 | Source Development Lab (SDL) Accelerator Safety Envelope (ASE) | Ackerman, Andrew | D | 5 | 9/23/2010 |
| LS-SDL-0022 | 3/24/2010 | SDL Pre-Engineered: Lead Shield Blocks Weighing 409 Pounds | Kiss, Robert | 5 | 3 | 3/24/2010 |
| LS-SDL-0023 | 10/20/2004 | The Commissioning Plan for the DUV-FEL 300 MeV Operation (SDL Accelerator Readiness Review) | Wang, Xijie | B | 5 | 11/10/2009 |
| LS-SDL-0024 | 3/24/2010 | SDL Pre-Engineered Lift SDL-505.04-001Top and Side Plates | Kiss, Robert | C | 3 | 3/24/2010 |
| LS-SDL-0025 | 3/24/2010 | SDL Pre-Engineered Lift SDL-505.49 Top & South Sdie Plates | Kiss, Robert | C | 3 | 3/24/2010 |
| LS-SDL-0026 | 3/24/2010 | SDL Pre-Engineered Lift SDL-505.04-001 North Side Plates | Kiss, Robert | D | 3 | 3/24/2010 |
| LS-SDL-0027 | 3/24/2010 | SDL Pre-Engineered Lift SDL 505.05 North Side Plates | Kiss, Robert | D | 3 | 3/24/2010 |
| LS-SDL-0029 | 3/24/2010 | SDL Pre-Engineered Lift SDL-505.05-049 West End Plates | Kiss, Robert | D | 3 | 3/24/2010 |
| LS-SDL-0030 | 4/22/2011 | DUV-FEL Operator Response to HPI Beam Loss and Chipmunk Radiation Monitors | Heese, Richard | C | 2 | 4/22/2011 |
| LS-SDL-0031 | 3/12/2012 | SDL Laser Safety Procedure - Deep Ultraviolet Free Electron Laser, Experiment End Station | Shen, Yuzhen | 11 | 1 | 3/12/2012 |
| LS-SDL-0032 | 3/21/2012 | SDL Laser Safety Procedure - SDL Drive Laser & Accelerator Enclosure Beams | Shen, Yuzhen | 13 | 1 | 3/21/2012 |
| LS-SDL-0033 | 2/9/2011 | Laser Operator for the SDL-Training Certification Checklist - Level I & II - SDL Laser Safety Procedure | Shen, Yuzhen | G | 1 | 2/16/2012 |
| LS-SDL-0034 | 10/20/2005 | Temporary Restrictions to DUV-FEL Operating Envelope | Ackerman, Andrew | B | 3 | 5/4/2009 |
| LS-SDL-0035 | 10/20/2009 | NSLS-SDL Linac Modulaor PFN Tuning and Troubleshooting | Ramirez, Gloria | B | 5 | 11/22/2010 |
| LS-SDL-0036 | 11/16/2009 | SDL Operation Check List | Wang, Xijie | E | 2 | 11/16/2009 |
| LS-SDL-0037 | 8/10/2011 | SDL Modulator Smoke Detector Test Procedure | Goel, Aditya | D | 2 | 8/10/2011 |
| LS-SDL-0039 | 10/20/2009 | SDL Klystron Installation/Removal | Ramirez, Gloria | B | 2 | 10/12/2011 |
| LS-SDL-0040 | 10/16/2009 | SDL 4 Wire Power Supply Calibration Procedure | Pedersen, Ken | A | 5 | 10/16/2009 |
| LS-SDL-0041 | 4/26/2010 | Control Room Response to a Modulator Integrated Current Detector Interlock Trip | Heese, Richard | A | 1 | 4/22/2011 |
| LS-SDL-0042 | 6/1/2010 | SDL Modulator PFN Inspection Procedure | Ramirez, Gloria | A | 2 | 6/6/2012 |
| LS-SDL-0043 | 12/9/2011 | SDL UED Operation Check List | Wang, Xijie | B | 2 | 12/9/2011 |
| LS-SDL-0044 | 12/9/2011 | SDL UED Shielding Checklist | Wang, Xijie | B | 2 | 12/9/2011 |
| LS-UA-0001 | 10/29/2009 | NSLS User Access Policy | Nasta, Kathy | L | 1 | 3/7/2012 |
| LS-UA-0002 | 8/24/2009 | NSLS User Access Procedures | Nasta, Kathy | D | 2 | 8/24/2009 |
| LT-C-ESH-PRC-001 | 2/2/2012 | Contingency Plan for 90-Day Waste Accumulation Area - Building 740 | Ackerman, Andrew | 1 | 3 | 2/2/2012 |
| LT-ESH-PRM-9.0.5 | 1/18/2011 | Building 945 Local Emergency Plan | Chmiel, Robert | 4 | 1 | 1/18/2011 |
| PS-ESH-0001 | 11/1/2010 | Reporting of Events at Non-Construction Sites | Buckley, Michael | A | 1 | 12/2/2011 |
| PS-ESH-0020 | 5/23/2012 | Contingency Plan for 90-Day Waste Accumulation Area - Building 703 East Wing Laboratories | Ackerman, Andrew | 2 | 3 | 5/23/2012 |
| PS-ESH-0053 | 6/8/2012 | Operation of Nano-material Glove Box in Bldg 725 Room 1-128 | Stiegler, Lori | 1 | 2 | 6/8/2012 |
| PS-ESH-0057 | 6/8/2012 | Laser Safety Program Documention X21 PLD | Stiegler, Lori | 1 | 1 | 6/8/2012 |
| PS-ESH-0059 | 6/6/2012 | Frequently Asked Questions About Environmental Management Systems | Stiegler, Lori | 1 | 1 | 6/6/2012 |
| PS-ESH-0060 | 6/6/2012 | Frequently Asked Questions about Occupational Health & Safety Management System (OHSAS 18001) | Stiegler, Lori | 2 | 1 | 6/6/2012 |
| PS-ESH-0061 | 6/15/2012 | Stiegler, Lori | 1 | 3 | ||
| PS-ESH-0064 | 5/11/2012 | Ventilation Check Procedure for Protein Crystallography | Stiegler, Lori | 1 | 3 | 5/11/2012 |
| PS-ESH-0067 | 6/11/2012 | NSLS Operations Group Response to X21 Ventilation Alarm | Stiegler, Lori | 1 | 3 | |
| PS-ESH-0072 | 4/30/2012 | X26C Laser Safety Program Documentation | Orville, Allan | 1 | 1 | 4/30/2012 |
| PS-ESH-0083 | 11/18/2011 | Laser Safety Program Documentation Bldg 703 E3/E4 | Conley, Ray | 1 | 1 | 11/18/2011 |
| PS-ESH-0085 | 11/18/2011 | Procedure for Replacing HEPA Filters Used as Exhaust Control for Work Involving Nanomaterials | Bauer, Debbie | A | 3 | 11/18/2011 |
| PS-ESH-0086 | 12/7/2011 | Flow Alarm Procedure for X6B, X7B and X9B | Trunk, John | 1 | 5 | 12/7/2011 |
| PS-ESH-0087 | 12/20/2011 | Hutch Exhaust Flow Test X6, X7, X9 and X14 | Chmiel, Robert | A | 3 | 12/20/2011 |
| PS-ESH-0088 | 1/20/2012 | Laser Safety Program Documentation 902 Room L1 | Stiegler, Lori | 1 | 3 | 1/20/2012 |
| PS-ESH-0090 | 6/20/2012 | Laser Safety Program Documentation – Raman X18/19 Frenkel Group | Stiegler, Lori | 1 | 1 | |
| PS-ESH-0091 | 6/29/2012 | NSLS Explosives Training (de minimis quantities) | Stiegler, Lori | 1 | 5 | |
| PS-ESH-PRM-1.3.5a | 12/6/2011 | Experiment Safety Review | Stiegler, Lori | 1 | 3 | 12/6/2011 |
| PS-ESH-PRM-1.8.0 | 3/20/2012 | Fall Protection and Elevated Work | Chmiel, Robert | 1 | 3 | 3/20/2012 |
| PS-ESH-PRM-2.3.2 | 4/30/2012 | RF and Microwaves | Stiegler, Lori | 2 | 3 | 4/30/2012 |
| PS-ESH-PRM-2.5.0 | 4/19/2012 | Compressed Gas Cylinder Storage Policy | Kiss, Robert | 1 | 3 | 4/19/2012 |
| PS-ESH-PRM-3.4.1 | 10/12/2011 | Safety System Work Permits | McDonald, Thomas | 1 | 3 | 10/12/2011 |
| PS-ESH-PRM-6.2.0 | 11/14/2011 | Lead Working Requirements | Chmiel, Robert | 1 | 3 | 11/14/2011 |
| PS-ESH-PRM-9.0.1 | 3/23/2012 | Local Emergency Plan Building 725 | Chmiel, Robert | 1 | 1 | 3/23/2012 |
| PS-ESH-PRM-9.0.2 | 6/10/2011 | Local Emergency Plan - Building 817 | Chmiel, Robert | 1 | 1 | 6/10/2011 |
| PS-ESH-PRM-9.0.3 | 2/29/2012 | Local Emergency Plan - Building 832 | Chmiel, Robert | 1 | 1 | |
| PS-ESH-PRM-9.0.3 | 1/20/2012 | Local Emergency Plan for Building 832 | Chmiel, Robert | 1 | 3 | 1/20/2012 |
| PS-ESH-PRM-9.0.4 | 6/28/2011 | Local Emergency Plan - Building 703 | Chmiel, Robert | 1 | 1 | 6/28/2011 |
| PS-ESH-PRM-9.0.6 | 3/26/2012 | Local Emergency Plan Building 726 | Chmiel, Robert | 2 | 1 | 3/26/2012 |
| PS-ESH-PRM-9.0.7 | 3/26/2012 | Local Emergency Plan Building 727 | Chmiel, Robert | 2 | 1 | 3/26/2012 |
| PS-ESH-PRM-9.0.8 | 3/26/2012 | Local Emergency Plan Building 728 | Chmiel, Robert | 2 | 1 | 3/26/2012 |
| PS-ESH-PRM-9.0.9 | 3/26/2012 | Local Emergency Plan Building 729 | Chmiel, Robert | 2 | 1 | 3/26/2012 |
| PS-ESH-PRM-9.1.0 | 2/10/2012 | Chmiel, Robert | 1 | 3 | 2/10/2012 | |
| PS-FRA-0003 | 4/16/2012 | Slip/Trip Hazards | Ackerman, Andrew | 1 | 3 | 4/16/2012 |
| PS-FRA-0003 | 4/16/2012 | Slip/Trip Hazards | Ackerman, Andrew | 1 | 3 | 4/16/2012 |
| PS-FRA-0006 | 4/16/2012 | General Housekeeping Issues | Ackerman, Andrew | 1 | 3 | 4/16/2012 |
| PS-FRA-0007 | 4/16/2012 | General Noise Issues | Ackerman, Andrew | 1 | 3 | 4/16/2012 |
| PS-JRA-0002 | 12/28/2011 | Work on Electrical Equipment in Zero Energy State | Ackerman, Andrew | 1 | 3 | 12/28/2011 |
| PS-JRA-0003 | 12/28/2011 | Troubleshooting energized electrical equipment in the following range 50v and 24v | Ackerman, Andrew | 1 | 3 | 12/28/2011 |
| PS-JRA-0007 | 5/27/2011 | Resistive Heating for Vacuum Bake Out | Ackerman, Andrew | 1 | 3 | 5/27/2011 |
| PS-JRA-0008 | 5/27/2011 | Work with Vacuum Systems | Ackerman, Andrew | 1 | 3 | 5/27/2011 |
| PS-JRA-0011 | 5/31/2011 | General Flammable Gas Work | Ackerman, Andrew | 1 | 3 | 5/31/2011 |
| PS-JRA-0013 | 6/29/2011 | Hand Held Power Tool Use | Ackerman, Andrew | 1 | 3 | 6/29/2011 |
| PS-JRA-0014 | 6/28/2011 | Hand Tool Use | Ackerman, Andrew | 1 | 3 | 6/28/2011 |
| PS-JRA-0015 | 5/16/2011 | General Instrumentation/Test Equipment | Ackerman, Andrew | 1 | 3 | 5/16/2011 |
| PS-JRA-0017 | 8/2/2011 | Machine Shop Use | Ackerman, Andrew | 1 | 3 | 8/2/2011 |
| PS-JRA-0019 | 9/1/2011 | Mechanical Material Handling | Ackerman, Andrew | 1 | 3 | 9/1/2011 |
| PS-JRA-0022 | 6/17/2011 | Transporting Chemicals and Radioactive Materials | Ackerman, Andrew | 1 | 3 | 6/17/2011 |
| PS-JRA-0025 | 8/31/2011 | Lead Handling - Job Risk Assessment | Ackerman, Andrew | 1 | 3 | 8/31/2011 |
| PS-JRA-0028 | 10/12/2011 | Conduct Accelerator or Beamline Commissioning or Fault Studies | Ackerman, Andrew | 1 | 3 | 10/12/2011 |
| PS-JRA-0029 | 7/19/2011 | Using a Beamline Job Risk Assessment | Ackerman, Andrew | 1 | 3 | 7/19/2011 |
| PS-JRA-0031 | 5/16/2011 | Work With Enclosed RF Systems | Ackerman, Andrew | 1 | 3 | 5/16/2011 |
| PS-JRA-0034 | 5/20/2011 | Photon Sciences OSHAS Job Risk Assessment for Interlock Testing | Ackerman, Andrew | 1 | 3 | 5/20/2011 |
| PS-JRA-0037 | 6/30/2011 | Work in an Oxygen Deficiency Hazard Area | Ackerman, Andrew | 1 | 3 | 6/30/2011 |
| PS-JRA-0042 | 12/22/2010 | Job Risk Assessment - Cable Pulling | Hoey, Steve | 1 | 3 | 12/22/2010 |
| PS-OPS-0005 | 4/17/2012 | Response to Emergencies at the NSLS | Chmiel, Robert | A | 1 | 4/17/2012 |
| PS-OPS-0006 | 5/1/2012 | Chmiel, Robert | A | 1 | 5/1/2012 | |
| PS-TRN-CRF-0018 | 8/16/2012 | Photon Sciences Laser OJT Roster | Corwin, Mary Anne | F | 3 | 8/16/2015 |
| PS-TRN-CRF-0020 | 5/23/2012 | Photon Sciences MHJPM Amplifier (125 kW) Line Winch Roster (Course Code PS-MHJPM-AMPLWINCH) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0021 | 5/23/2012 | Photon Sciences ELEC PPE - Category 1 Roster (Course Code PS-ELEC-PPE-CAT1) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0022 | 5/23/2012 | Photon Sciences ELEC PPE - Category 2 Roster (Course Code PS-ELEC-PPE-CAT2) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0023 | 5/23/2012 | Photon Sciences ELEC PPE - Category 4 Roster (Course Code PS-ELEC-PPE-CAT4) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0024 | 5/31/2012 | Photon Sciences TECH PROC LN2 Manual Fill B725 Rm151A Roster (Course Code PS-TECH-LN2FILL) | Corwin, Mary Anne | C | 3 | 5/31/2012 |
| PS-TRN-CRF-0026 | 5/23/2012 | Photon Sciences CTRL RM B725 Ops - Chem Spill Response Roster (Course Code PS-CR-B725-CHEMSPILL) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0027 | 5/23/2012 | Photon Sciences CTRL RM B725 Ops - Emergency Response Roster (Course Code PS-CR-B725-EMERGRESP) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0028 | 5/23/2012 | Photon Sciences CTRL RM B725 Ops - Oxygen Def Response Roster (Course Code PS-CR-B725-ODHDEF) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRF-0029 | 5/23/2012 | Photon Sciences CTRL RM B725 Ops - X21 Response Roster (Course Code PS-CR-B725-X21-RESP) | Corwin, Mary Anne | B | 3 | 5/23/2012 |
| PS-TRN-CRM-0001 | 4/27/2012 | Photon Sciences Environmental Awareness for Electrical and Mechanical Technicians (Course Material) (Course Code PS-ENV-ELECMECH) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0002 | 4/27/2012 | Photon Sciences Environmental Awareness for Crystal Cutting (Course Code - PS-ENV-CRYSTAL-CUT) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0003 | 4/27/2012 | Photon Sciences Environmental Awareness for Crystal Etching (Course Code - PS-ENV-CRYSTAL-ETCH) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0004 | 4/27/2012 | Photon Sciences Environmental Awareness for Lead (Course Code - PS-ENV-LEAD) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0005 | 4/27/2012 | Photon Sciences Environmental Awareness for Photographic Darkroom Operations (Course Code - PS-ENV-PHOTO) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0006 | 4/27/2012 | Photon Sciences Environmental Awareness for Satellite Accumulation Area Manager (Course Code - PS-ENV-SAA) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0007 | 4/27/2012 | Photon Sciences Environmental Awareness for Machine Shop Operations (Course Code - PS-ENV-SHOP) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0008 | 4/27/2012 | Photon Sciences Environmental Awareness for Vacuum Ssytem Maintenance (Course Code - PS-ENV-VAC) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0009 | 4/27/2012 | Photon Sciences Environmental Awareness for Water Systems (Course Code - PS-ENV-WAT) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0011 | 4/27/2012 | Photon Sciences Nano-Science Safety Requirements (Course Code - PS-EXP-NANO-SFTY) | Corwin, Mary Anne | B | 3 | 4/27/2012 |
| PS-TRN-CRM-0012 | 4/30/2012 | Photon Sciences Americium-241 Sealed Source User Training (Course Code - PS-RAD-AM241) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-CRM-0014 | 4/30/2012 | Photon Sciences Safety Rules for Machine Shop Users (Course Code - PS-MS-SHOP-RULES) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-CRM-0015 | 4/30/2012 | Photon Sciences Work Control Coordinator's Briefing (Course Code - PS-WCC-BRIEF) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-CRM-0016 | 5/2/2012 | Photon Sciences Environment, Safety and Health (ESH) Briefing (Course Code PS-ESH-BRIEF) | Corwin, Mary Anne | D | 3 | 5/2/2012 |
| PS-TRN-CRM-0017 | 4/30/2012 | Photon Sciences Environment, Safety & Health Briefing for Source Development Laboratory (SDL) (Course Code - PS-ESH-BRIEF-SDL) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-R2A2-0001 | 4/30/2012 | Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Beam Line Local Contact (Course Code PS-R2A2-LOCALCONTACT) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-R2A2-0002 | 4/30/2012 | Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Beam Line Spokesperson (Course Code PS-R2A2-SPOKESPERSON) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-R2A2-0003 | 4/30/2012 | Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Laboratory Steward (Course Code PS-R2A2-LAB-STWD) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-R2A2-0004 | 4/30/2012 | Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Deputy Laboratory Steward (Course Code PS-R2A2-LAB-STWD-DEP) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-R2A2-0005 | 4/30/2012 | Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Lead Experimenter (Course Code PS-R2A2-LEADEXPRMNTR) | Corwin, Mary Anne | B | 3 | 4/30/2012 |
| PS-TRN-REQ-0001 | 11/30/2011 | Photon Sciences Training Program | Corwin, Mary Anne | A | 1 | 11/30/2011 |
| SLS-08.002-007-1 | 11/13/2009 | NSLS Equipment Responsibilities Source Development Laboratory (SDL) | Heese, Richard | J | 1 | 4/22/2011 |