NSLS Controlled Documents (Active)

Document Number Date Subject Preparer Rev Review
Freq. (yrs.)
Last Reviewed
DL-QAP-1003 5/16/2008 Light Sources Directorate EMS/OHSAS Records Management Cheswick, Ed A 3 5/16/2008
LS-ADM-0002 3/27/2007 Access to Property Protection Areas Kiss, Robert C 3 10/19/2010
LS-ADM-0003 5/15/2007 Overhead Crane Use Procedure for NSLS OOS (Out-of-Service) Cranes Kiss, Robert 1 1 11/14/2011
LS-ADM-0004 3/28/2008 NSLS Temporary Storage Area Policy Kiss, Robert 1 3 3/28/2008
LS-AI-0001 9/16/2010 The NSLS X-Ray Ring Active Interlock System Operations Policy Zitvogel, Emil E 2 9/16/2010
LS-AI-0002 1/22/2004 X17 Super Conducting Wiggler E-B Space Active Interlock Operational Test Zuhoski, Peter A 5 5/5/2009
LS-AI-0003 3/9/2004 Active Interlock Local Logic Commissioning Procedure for X-29 Rothman, Jeff 1.0 5 2/19/2009
LS-CD-0001 1/1/2008 Insertion Device LOTO for X1, X13 MGU, X13EPW, X21, X25, X29 & VUV TOK Danneil, Chris D 1 12/30/2011
LS-CD-0002 3/1/2005 Insertion Device Beam Pipe Switch Bypass Procedure Danneil, Chris B 1 12/30/2011
LS-CD-0003 3/1/2005 ATA-2001 Calibration for Insertion Device LVDT's Danneil, Chris B 3 1/11/2011
LS-CD-0005 2/16/2005 Bench Test Procedure for the Active Interlock Local Logic 2 (SLS 61.271) Tallent, Jack B 5 2/3/2010
LS-CD-0006 1/1/2004 Bench Test Procedure for Active Interlock Central Logic Chassis (SLS 61.150) and Control Room Display Chassis (SLS 61.77) Tallent, Jack A 5 5/5/2009
LS-CD-0007 1/1/2004 Bench Test of the Active Interlock 16 Channel Buffer Chasis (SLS 61.52) Tallent, Jack A 5 5/5/2009
LS-CD-0008 1/1/2004 Bench Test of Active Interlock Aux Fault Combiner Chassis SLS 61.178 Tallent, Jack A 5 5/5/2009
LS-CD-0009 1/1/2008 Insertion Device LOTO for VUV U5 Danneil, Chris C 1 12/30/2011
LS-CD-0010 6/6/2008 Uninterruptile Power Systems Danneil, Chris D 1 3/18/2011
LS-CD-0011 4/1/2008 Scraper LOTO, VUV U5 & X-Ray X13 Danneil, Chris B 1 12/30/2011
LS-CO-0001 10/22/2007 NSLS Conduct of Operations Manual Buckley, Michael B 5 10/22/2007
LS-CO-0002 10/22/2007 Conduct of Operations Exceptions & Deviations Buckley, Michael B 5 10/22/2007
LS-CS-0001 5/20/2011 Computer System Call-In List Yin, Zhijan 3 2 5/20/2011
LS-CS-0002 3/1/2001 NSLS Computer Serial Communications Requirements Yin, Zhijan A 5 2/28/2011
LS-ES-0002 5/24/2011 Procedure for Acid Etching of Silicon and Germanium Crystals Lenhard, Anthony 4 3 5/24/2014
LS-ES-0003 1/30/2003 Procedure for testing NSLS crystal cutter RGD diffraction unit shutter control lights Greene, Richard A 5 12/12/2007
LS-ES-0004 3/7/2011 Access Controls - Building 725, Rooms 2-101 Property Protection Area Yin, Zhijan D 1 3/7/2011
LS-ES-0005 11/23/2009 Transport Enclosure Wall Panel Removal/Installation using "Tecknit" Lifting Fixture Haas, Edwin A 3 11/23/2009
LS-ESH-0004 12/17/2009 NSLS Operations Group Chemical Spill and Gas Release Response Ackerman, Andrew 05 3 12/17/2009
LS-ESH-0007 1/9/2002 Scripts to be used by NSLS Machine Operators During and Emergency. Chmiel, Robert 1 3 3/10/2011
LS-ESH-0009 2/24/2010 Qualified Search Personnel for NSLS Accelerators Chmiel, Robert D 1 6/13/2012
LS-ESH-0010 3/9/2005 VUV Injection Shutter LOTO Buckley, Michael B 1 7/21/2010
LS-ESH-0011 7/22/2010 Radiation Safety LOTO Buckley, Michael C 1 7/22/2010
LS-ESH-0012 2/11/2008 Linac LOTO Buckley, Michael C 1 7/21/2010
LS-ESH-0013 9/16/2008 Controlled Access to the VUV Ring Chmiel, Robert C 3 6/13/2012
LS-ESH-0014 2/13/2008 Radiation Safety Interlocks at the National Synchrotron Light Source Buckley, Michael 3 3 3/24/2011
LS-ESH-0016 9/19/2008 Radiation Badge Wearer's Instructions at the NSLS Stiegler, Lori 8 5 9/19/2008
LS-ESH-0017 10/31/2010 Transport of Hazardous and Radioactive Materials Stiegler, Lori 4 2 10/31/2010
LS-ESH-0019 12/29/2009 Beam Line Configuration Control Checklist Requirements Chmiel, Robert D 2 12/29/2009
LS-ESH-0020 12/12/2007 Biosafety Requirements at the NSLS Ackerman, Andrew B 3 11/30/2010
LS-ESH-0021 12/12/2007 Biosafety Level 2 work at the NSLS/A Technical Basis Ackerman, Andrew B 3 11/30/2010
LS-ESH-0023 7/15/2003 X-Ray Injection Shutter LOTO Buckley, Michael A 1 7/21/2010
LS-ESH-0024 6/19/2009 Visible Light Hazard at the NSLS VUV and X-Ray Rings Hulbert, Steve C 5 6/19/2009
LS-ESH-0026 9/16/2011 Laser Program Documentation U2A Liu, Zhenxian 4 1 9/16/2011
LS-ESH-0027 10/15/2010 U6/U13 Laser Safety Program Documentation Carr, Larry 6 1 10/15/2010
LS-ESH-0030 1/15/2010 NSLS Procedures for Preparing and Operating Infrared Laboratories IR Detectors Using Pumped Liquid He (T<4.2K) Carr, Larry B 3 1/15/2010
LS-ESH-0031 1/15/2010 NSLS Procedures for Preparing and Operating Infrared Laboratories IR Detectors Using T=4.2K (Non-Pumped Liquid He) Carr, Larry B 3 1/15/2010
LS-ESH-0032 12/1/2010 Laser Program Safety Documentation X20C jordan-sweet, jean 4 1 10/26/2011
LS-ESH-0034 3/13/2008 Response to "WORKDAY & HOURLY RADIATION ALARMS" - Channel 26 Buckley, Michael C 2 9/23/2010
LS-ESH-0034A 3/16/2011 Authorization List - Permission to Exceed Area Radiation Monitor Action Levels Buckley, Michael E 2 3/16/2011
LS-ESH-0036 2/9/2011 X-Ray Beamline Hutch Search Procedure Buckley, Michael B 5 2/9/2011
LS-ESH-0039 3/4/2005 Worker Qualification Matrices Buckley, Michael A 1 8/9/2010
LS-ESH-0040 9/14/2011 NSLS Dark Room Procedure Raghothamachar, Balaji 4 2 9/14/2011
LS-ESH-0044 4/20/2012 90-DAY WASTE STORAGE AREA CONTINGENCY PLAN McDonald, Thomas 8 1 4/20/2015
LS-ESH-0048 10/17/2011 X7B Gas Cabinet Procedure Hanson, Jonathan 2 2 10/17/2011
LS-ESH-0049 9/17/2007 SDL Laser Interlock Test LOTO McDonald, Thomas A 1 6/13/2012
LS-ESH-0051 10/1/2007 Operation of Nano-Material Hood in Room 1-128 Stiegler, Lori 1 2 8/8/2011
LS-ESH-0052 8/5/2008 Devalving of Compressed Gas Cylinders Klaus, Keith 2 5 8/5/2008
LS-ESH-0056 1/5/2009 Special Requirements for Working With Hydrofluoric Acid at NSLS After Normal Business Hours Klaus, Keith 1 5 1/5/2009
LS-ESH-0065 6/16/2009 Building 729 Fire Hazard Assessment/Fire Hazard Analysis Chmiel, Robert 1 3 6/16/2009
LS-ESH-0066 4/24/2009 Operating Procedure: NSLS X-Ray Generator at U7A Rodriquez, Jose 1 3 4/24/2009
LS-ESH-0068 7/15/2009 Building 725 Fire Hazard Analysis/Fire Hazard Assessment Chmiel, Robert 1 3 7/15/2009
LS-ESH-0069 7/30/2009 Define Experiment Sample CMS Requirements at NSLS Klaus, Keith 1 3 7/30/2009
LS-ESH-0070 9/30/2009 NSLS Gas Cylinder Cart Inspections Stiegler, Lori 1 3 9/30/2009
LS-ESH-0071 11/23/2009 X17 Transport Enclosures Commissioning and Survey Plan Chmiel, Robert A 1 3/10/2011
LS-ESH-0075 5/10/2010 X10C Gas Handling System Sansone, Michael 1 3 5/10/2010
LS-ESH-0077 8/30/2010 X17 Small Transport Enclosure Access Plan Chmiel, Robert A 3 8/30/2010
LS-ESH-0078 10/27/2010 X17A Beamline Commissioning and Survey Plan Chmiel, Robert A 1 10/27/2010
LS-ESH-0079 5/13/2011 X17B3 Laser Safety Program Documentation Hong, Xinguo 1 1 6/7/2012
LS-ESH-0080 5/17/2011 Hutch Exhaust Flow Test Buckley, Michael A 3 5/17/2011
LS-ESH-0082 10/1/2011 X10C Gas Handling System Procedure Fareria, Larry 1 3 10/1/2011
LS-ESH-0084 9/26/2011 Securing the X1A1 Sample Chamber Chmiel, Robert A 3 9/26/2011
LS-ESH-PRM-0.1.0 8/10/2011 Minors Stiegler, Lori 12 3 8/10/2011
LS-ESH-PRM-0.2.0 6/7/2011 Policy for Access to NSLS & SDL Controlled Areas Including TLD Requirements Ackerman, Andrew 10 3 6/7/2011
LS-ESH-PRM-1.2.0 4/29/2009 Environmental, Safety and Health Inspections Klaus, Keith 8 3 4/29/2009
LS-ESH-PRM-1.3.5b 1/3/2008 Beamline Safety Review Ackerman, Andrew 8 3 11/30/2010
LS-ESH-PRM-1.3.6 5/8/2007 Work Planning and Control Procedure Boerner, Albert 6 3 5/4/2010
LS-ESH-PRM-1.5.0 5/4/2010 Electrical Safety Chmiel, Robert 18 3 5/4/2010
LS-ESH-PRM-1.5.1 7/28/2011 Lockout/Tagout (LOTO) Requirements McDonald, Thomas 12 3 7/28/2011
LS-ESH-PRM-1.5.2 1/12/2009 Standards for use of Coaxial Cables and Connectors in Signal and High Voltage Systems by NSLS Users and Staff Ackerman, Andrew 3 3 1/2/2009
LS-ESH-PRM-1.5.3 3/10/2010 Interlock Safety Buckley, Michael 9 3 3/10/2010
LS-ESH-PRM-1.5.4 5/4/2010 Beamline Hazardous Equipment Labeling Requirements Chmiel, Robert 2 3 5/4/2010
LS-ESH-PRM-1.6.0/1.6.1 9/24/2008 Material Handling: Equipment and Procedures Kiss, Robert 4 3 9/24/2008
LS-ESH-PRM-1.9.0 10/4/2009 Consumption of Food in the NSLS Experimental Areas Chmiel, Robert 1 3 10/4/2009
LS-ESH-PRM-2.1.0 6/27/2011 Hazard Communication Program Stiegler, Lori 8 3 6/27/2011
LS-ESH-PRM-2.1.2 9/10/2007 Storage, Usage, Containment & Transfer of Toxic & Hazardous Chemicals Chmiel, Robert 5 3 2/8/2011
LS-ESH-PRM-2.4.0 6/4/2010 Exhaust Ventilation Stiegler, Lori 2 3 6/4/2010
LS-ESH-PRM-2.6.0 1/28/2010 Beryllium Management Klaus, Keith 1 3 1/28/2010
LS-ESH-PRM-2.7.0 4/8/2011 Exposure Control Plan Stiegler, Lori 1 1 6/13/2012
LS-ESH-PRM-3.2.0 12/28/2009 Collective Dose Goals Zafonte, Frank 5 1 12/20/2010
LS-ESH-PRM-3.2.1 8/26/2009 Administrative Control Levels Casey, W.R. 6 3 8/26/2009
LS-ESH-PRM-5.1.0 8/11/2009 Cryogenic Liquids, Storage, Usage and Handling Stiegler, Lori 6 3 8/11/2009
LS-ESH-PRM-7.0.0 4/15/2011 Hazardous Waste Management McDonald, Thomas 10 3 4/15/2011
LS-FRA-0001 8/15/2008 General Chemical Hazards Ackerman, Andrew 2 3 8/15/2008
LS-FRA-0002 8/15/2008 General Fire Issues - Facility Fire Hazards and Controls Ackerman, Andrew 3 3 8/15/2008
LS-FRA-0004 8/15/2008 General Electrical Issues Ackerman, Andrew 2 3 8/15/2008
LS-FRA-0005 8/15/2008 General Material Handling Hazards Ackerman, Andrew 2 3 8/15/2008
LS-FRA-0008 8/15/2008 General Radiation Issues Ackerman, Andrew 2 3 8/15/2008
LS-FRA-0009 8/15/2008 General ODH (Oxygen Deficiency Hazard) Issues Ackerman, Andrew 2 3 1/20/2012
LS-INT-0002 3/7/2002 X-Ray Safety Shutter Solenoid Replacment Procedure Gallagher, John B 3 10/12/2011
LS-INT-0003 1/14/2004 X17 Wiggler Power Supply Interlock Test Procedure Orr, Ewart A 2 2/23/2012
LS-INT-0004 1/22/2004 Critical Device Over Temperature Interlock Klixon Test Procedure Orr, Ewart A 2 1/9/2012
LS-INT-0005 1/23/2004 Test Procedure for the Critical Device Over Temperature Interlock Aluminum Section Orr, Ewart A 2 1/9/2012
LS-INT-0006 1/23/2004 Critical Device Over Temperature Interlock, RF Dump Test Procedure Orr, Ewart A 2 12/13/2010
LS-INT-0007 2/28/2005 Fast Valve Trigger Box Removal Gallagher, John A 5 10/12/2011
LS-INT-0008 2/28/2005 Removal/Replacement of X17B2 Backstop Switches Gallagher, John A 5 10/12/2011
LS-INT-0009 2/28/2005 Fast Valve Sensor Calibration Procedure Gallagher, John A 5 10/12/2011
LS-INT-0015 12/1/2007 Procedure for Mode One Logic Board Bench Test (AC & DC) Orr, Ewart A 2 10/12/2011
LS-JRA-0001 2/7/2009 Electrical & Electronic Shop Work Ackerman, Andrew 3 3 2/7/2009
LS-JRA-0005 2/7/2009 Performing LOTO Ackerman, Andrew 3 3 2/14/2012
LS-JRA-0006 9/24/2010 Mechanical Assembly of Accelerator or Beam Line Components Ackerman, Andrew 3 3 9/24/2010
LS-JRA-0009 9/28/2010 Work with Compressed Gas Cylinders and Systems Ackerman, Andrew 3 3 9/28/2010
LS-JRA-0010 7/6/2009 General Cryogenic Work Ackerman, Andrew 4 3 7/6/2009
LS-JRA-0012 9/23/2010 Work With Cooling Water Systems 2010 JRA Review Ackerman, Andrew 3 3 9/23/2010
LS-JRA-0020 7/10/2009 Work With Laboratory Chemicals Ackerman, Andrew 3 3 7/10/2009
LS-JRA-0021 7/10/2009 Routine Chemical Use Ackerman, Andrew 3 3 7/10/2009
LS-JRA-0023 8/5/2010 Use of Unsealed Radioactive Materials Ackerman, Andrew 3 3 8/5/2010
LS-JRA-0024 8/5/2010 Radioactive Source Use Ackerman, Andrew 3 3 8/5/2010
LS-JRA-0026 8/20/2008 Job Risk Assessment: Generating Hazardous Waste Ackerman, Andrew 2 3 9/1/2011
LS-JRA-0027 8/20/2008 Job Risk Assessment: Generating Radioactive and Mixed Waste Ackerman, Andrew 2 3 8/24/2011
LS-JRA-0030 9/22/2010 Operate an Accelerator Ackerman, Andrew 4 3 9/22/2010
LS-JRA-0032 7/1/2008 Magnetic Field Work Ackerman, Andrew 2 3 7/1/2008
LS-JRA-0033 10/3/2008 Work With Lasers Ackerman, Andrew 2 3 10/3/2008
LS-JRA-0035 8/25/2008 Elevated Work Ackerman, Andrew 2 3 8/25/2008
LS-JRA-0036 9/3/2010 Use of Portable Ladders Ackerman, Andrew 3 3 9/23/2010
LS-JRA-0041 8/5/2010 Radiation Generating Devices Ackerman, Andrew 2 3 8/5/2010
LS-LES-0001 10/1/2010 X6B Flight Path Procedure DiMasi, Elaine 1 5 10/1/2010
LS-M-0001 8/16/2007 Air Conditioning (A.C.) Call-In Procedure Beauman, Ron K 1 1/5/2012
LS-M-0003 10/2/2003 Procedure for "Introducing" Equipment or Branches into an Operational NSLs Water System Beauman, Ron B 5 10/1/2008
LS-M-0004 9/23/1999 Test Resistivity & Re-Charge High Pressure Copper Water System Deionizer Beauman, Ron A 5 8/3/2011
LS-M-0005 11/4/1999 Test Resistivity & Re-Charge Low Pressure Copper Water System Deionizer Beauman, Ron A 5 10/12/2010
LS-M-0006 11/5/1999 Test Resistivity & Re-Charge Aluminum Water System Deionizer Beauman, Ron A 5 1/28/2010
LS-M-0007 2/17/2009 NSLS Emergency Plan for Maintaining Process & Cooling Systems During a High Temperature Event (A Chilled Water Shutdown) Beauman, Ron E 5 2/17/2009
LS-M-0008 9/12/2003 Water Isolation Control and Alarms for NSLS Structural Biology Environmental Units Beauman, Ron B 5 10/1/2008
LS-M-0010 2/2/2009 NSLS Utilities Checklists for Emergency Shutdowns Beauman, Ron C 5 2/2/2009
LS-M-0011 9/30/2011 NSLS Site Compressed Air Interlock System Beauman, Ron C 5 9/30/2011
LS-M-0013 4/5/2006 Procedure for Re-Setting Temperature Controller From Automatic Switch Over Beauman, Ron B 5 2/23/2011
LS-M-0014 12/30/2011 Procedure to Start-Up Pumps for Low Pressure Copper System Beauman, Ron B 5 12/30/2011
LS-M-0015 12/30/2011 Procedure to Start-Up Pumps for Aluminum System Beauman, Ron C 5 12/30/2011
LS-M-0016 4/4/2011 Operations Group Response for X17 Superconducting Wiggler and Cryogenic System Alarms Freudenburg, Richard 5 5 4/4/2011
LS-M-0017 2/12/2009 Test Resistivity and Replace Cartridges for Experimental Water Systems Beauman, Ron B 5 2/12/2009
LS-M-0018 3/16/2007 Cleaning Procedure for Magnets and Other Components Beauman, Ron D 5 3/16/2007
LS-M-0019 2/20/2009 Procedure to Change Nitrogen (Bottles) for Beamline Front End Vacuum Valves & Shut-Off Valve Rebuild Information Beauman, Ron D 5 2/20/2009
LS-M-0020 6/17/2005 Procedure for Proteus Switch Adjustment and Maintenance Beauman, Ron B 5 7/14/2010
LS-M-0021 6/16/2005 Procedure for Proteus Rotor and Pin Replacement Conducted by the NSLS Control Room Beauman, Ron B 5 7/14/2010
LS-M-0024 6/30/2005 Procedure for Mini-Myte Air Solenoid Replacement Beauman, Ron B 5 4/29/2011
LS-M-0025 6/6/2007 Work on Laboratory Exhaust Hoods and Associated Fans Beauman, Ron A 5 6/6/2007
LS-M-0026 8/22/2007 Preventive Maintenance Procedure for Air Compressors and Driers Beauman, Ron A 5 8/22/2007
LS-M-0027 8/22/2007 Preventive Maintenance Procedure for Air Solenoids Beauman, Ron A 5 8/22/2007
LS-M-0028 8/22/2007 Preventive Maintenance Procedure for Pneumatic Components & Lines Beauman, Ron A 5 8/22/2007
LS-M-0029 8/22/2007 Preventive Maintenance Procedure for Pneumatic Filters Beauman, Ron A 5 8/22/2007
LS-M-0030 8/22/2007 Preventive Maintenance Procedure for Air & Water Poly-Flo Hoses Beauman, Ron A 5 8/22/2007
LS-M-0031 8/22/2007 Preventive Maintenance Procedure for Cold Box Units Beauman, Ron A 5 8/22/2007
LS-M-0032 8/22/2007 Preventive Maintenance Procedure for HPC, LPC & Aluminim Di Pumps Beauman, Ron A 5 8/22/2007
LS-M-0033 8/22/2007 Preventive Maintenance Procedure for Hytron Cooling Water Hoses Beauman, Ron A 5 8/22/2007
LS-M-0034 8/22/2007 Preventive Maintenance Procedure for Aluminum Di Unit Beauman, Ron A 5 8/22/2007
LS-M-0035 8/22/2007 Preventive Maintenance Procedure for Experimental Di Unit Beauman, Ron A 5 8/22/2007
LS-M-0036 8/22/2007 Preventive Maintenance Procedure for HPC Di Unit Beauman, Ron A 5 8/22/2007
LS-M-0037 8/22/2007 Preventive Maintenance Procedure for LPC Di Unit Beauman, Ron A 5 8/22/2007
LS-M-0038 8/22/2007 Preventive Maintenance Procedure for Experimental System Water Filter Beauman, Ron A 5 8/22/2007
LS-M-0039 8/22/2007 Preventive Maintenance Procedure for Motors Beauman, Ron A 5 8/22/2007
LS-M-0040 8/22/2007 Preventive Maintenance Procedure for Water Filters Beauman, Ron A 5 8/22/2007
LS-M-0041 8/22/2007 Preventive Maintenance Procedure for Proteus Units Beauman, Ron A 5 8/22/2007
LS-M-0042 8/22/2007 Preventive Maintenance Procedure for HPC, LPC, Aluminum & Experimental Process Pumps Beauman, Ron A 5 8/22/2007
LS-M-0043 8/22/2007 Preventive Maintenance Procedure for Process Water Samples Beauman, Ron A 5 8/22/2007
LS-M-0044 8/22/2007 Preventive Maintenance Procedure for Chilled & Condenser Water Strainers Beauman, Ron A 5 8/22/2007
LS-M-0045 9/27/2007 Preventive Maintenance Procedure for HPC, LPC, Aluminum and Experimental Site and Trane Heat Exchangers Beauman, Ron A 5 9/27/2007
LS-M-0046 4/20/2009 NSLS Emergency Plan for a Low Temperature Event (Pipe Freezing Protection) Beauman, Ron A 5 4/20/2009
LS-M-0047 11/30/2011 Procedure for Remote Pump Start and Stop for HPC, LAC Alum, and EXP Beauman, Ron A 5 11/30/2011
LS-M-0101 9/21/2011 Operating Procedure for Leak Testing UHV Components Hu, Jih-Perng B 3 9/21/2011
LS-M-0102 9/20/2011 Vacuum Procedure to Vent or Pump-Down Storage Ring Sector Hu, Jingzhu B 3 9/20/2011
LS-M-0103 9/22/2011 Vacuum Procedrue for Baking Out VUV or X-Ray Storage Ring Sector Hu, Jih-Perng B 3 9/22/2011
LS-M-0104 9/23/2011 Vacuum Procedure for Leak Testing Small Parts and Components Hu, Jih-Perng B 3 9/23/2011
LS-M-0105 9/23/2011 Vacuum Procedrue for Calibration of Residual Gas Analyzer Hu, Jih-Perng B 3 9/23/2011
LS-M-0106 9/23/2011 Vacuum Procedure for Testing Titanium Sublimation Pump (TSP) Hu, Jih-Perng B 3 9/23/2011
LS-M-0107 9/26/2011 Procedure for Testing 220 l/sec Sputter Ion Pump (SIP) Hu, Jih-Perng B 3 9/26/2011
LS-M-0108 9/26/2011 Vacuum Procedrue to Open VUV or X-Ray Front End Valve to Ring Hu, Jih-Perng B 3 9/26/2011
LS-M-0109 9/26/2011 Vacuum Procedure to Back Fill and to Recover Front End Vacuum Hu, Jih-Perng B 3 9/26/2011
LS-M-0110 2/19/2010 NSLS/Vacuum Procedure to Run X-Ray or VUV Front End RGA Scans Using VG SX-200 Electronics and Analyzer Heads Hu, Jih-Perng B 3 2/19/2010
LS-M-0111 2/19/2010 Calibration Procedure for Sensitivity Calibrators (SC4 or SC5) Using a Transfer Method Hu, Jih-Perng B 3 2/19/2010
LS-M-0112 2/19/2010 Change Filament Wire or Input to Sublimation Box Hu, Jih-Perng B 3 2/19/2010
LS-M-0113 2/19/2010 Technical Specification to Remove High Voltage Connector From Ion and Dip Pumps Hu, Jih-Perng B 3 2/19/2010
LS-M-0114 2/19/2010 Titanium Coating Internal Surfaces of Ceramic Chambers Hu, Jih-Perng B 3 2/19/2010
LS-M-0115 9/26/2011 Procedure and Guidelines to Commission or to Re-open NSLS Beam Lines to Storage Ring Vacuum & Synchrotron Light Hu, Jih-Perng B 3 9/26/2011
LS-M-0116 9/28/2011 Procedure for Bake-Out Control of VUV Ring and X-Ray Ring Sector and for Booster, Injection and Linac Sections Hu, Jih-Perng C 3 9/28/2011
LS-M-0117 9/30/2011 Technical Specification to Remove High Voltage Connector From Cold Cathode Gauges and/or 2 Liter/Second Ion Pumps Hu, Jih-Perng C 3 9/30/2011
LS-M-0118 9/30/2011 Technical Specification to Change Connections to Hot Filament Ion Gauges and/or to Replace a Hot Filament Ion Gauge Controller Hu, Jih-Perng C 3 9/30/2011
LS-M-0119 9/26/2011 Procedure to Safely Replace a VUV or X-Ray Storage Ring Sector or Front End All-Metal Gate Value Hu, Jih-Perng C 3 9/26/2011
LS-M-0120 9/28/2011 Procedure to Safely Replace a VUV or X-Ray Storage Ring Front End Fast Valve Hu, Jih-Perng C 3 9/28/2011
LS-M-0121 9/28/2011 Procedure to Safely Replace Any Component Parts of the NSLS Vuv or X-Ray Storage Ring Front End Partial Pressure RGA Monitoring System Hu, Jih-Perng C 3 9/28/2011
LS-M-0122 3/24/2008 Bake Out Nintzel, Gary A 3 4/25/2011
LS-M-0201 5/4/1999 Subject: Optical Instrument Calibration Procedure - N-3 Level Scheuerer, Robert A 5 9/30/2008
LS-M-0202 5/4/1999 Subject: Optical Instrument Calibration Procedure - Theodolite Scheuerer, Robert A 5 9/30/2008
LS-M-0203 6/1/2004 Optical Instrument Calibration Procedure - Optical Plum Scheuerer, Robert A 5 9/30/2008
LS-M-0301 5/7/2010 Prefentative Maintenance Procedure for NSLS Ring Magnets That Are Interlocked Mortazavi, Payman B 3 5/7/2010
LS-M-0302 5/7/2010 NSLS Preventative Maintenance Procedure for Insertion Devices Mortazavi, Payman B 5 5/7/2010
LS-M-0303 5/7/2010 Preventative Maintenance Procedure for NSLS Diagnostic Devices Scheuerer, Robert B 1 5/2/2011
LS-M-0304 2/2/2011 VUV 52 MHz RF Systems Mortazavi, Payman B 1 2/2/2011
LS-M-0305 1/21/2011 X-Ray RF System "One" Mortazavi, Payman B 1 1/21/2011
LS-M-0306 1/21/2011 X-Ray RF System "Two" Mortazavi, Payman B 1 1/21/2011
LS-M-0307 1/21/2011 X-Ray RF System "Three" Mortazavi, Payman B 1 1/21/2011
LS-M-0308 1/21/2011 X-Ray RF System "FOUR" Mortazavi, Payman B 1 1/21/2011
LS-M-0309 3/28/2002 Preventive Maintenance Procedure for NSLS X-Ray Ring Shutter Tanks Scheuerer, Robert A 5 2/23/2007
LS-M-0310 2/16/2011 Oxygen Monitoring Systems Preventive Maintenance and Functional Interlock Test Procedure Mortazavi, Payman 6 1 2/16/2011
LS-M-0403 2/24/2009 Vertical Test Facility Test Procedure Harder, Dave A 5 2/24/2009
LS-M-0600 6/30/2002 Test and Certification Procedure for Laser Shutter Woodle, Marty A 2 6/30/2010
LS-M-0601 4/8/2002 Test Procedure for Laser Shutter Thermal Limits Haas, Edwin A 5 10/25/2007
LS-M-0602 1/7/2005 Procedure for Accepting New Work for the Mechanical Section Technician/Machine Shops Scheuerer, Robert A 2 10/22/2010
LS-M-0700 1/25/2005 Lifting Items Over the VUV Ring Kiss, Robert C 3 11/14/2011
LS-NSLS-0006 2/2/2006 NSLS Accelerator Safety Envelope Ackerman, Andrew 2 5 2/2/2006
LS-NSLS-0007 11/1/2001 Finding of No Significant Impact: Proposed Upgrade & Improvement of the NSLS @ BNL, Upton, NY Gmur, Nick 1 5 8/3/2011
LS-NSLS-0008 10/1/2001 Environmental Assessment: Proposed Upgrade & Improvement of the NSLS @ BNL, Upton, NY Gmur, Nick 1 5 6/28/2011
LS-NSLS-0011 2/1/2004 Induced Radioactivity & Ozone Production in Air from National Synchrotron Light Source (NSLS) Operation: An Assessment for NESHAPS (National Emission Standards for Hazardous Air Polluntants) Ackerman, Andrew A 1 6/21/2011
LS-NSLS-0012 8/14/2006 NSLS Safety Assessment Document (SAD) Gmur, Nick 2 5 8/31/2011
LS-OPM-0000 9/28/2004 Accelerator Operator Manual Podobedov, Boris C 4 4/16/2009
LS-OPM-0001 5/2/2001 Accelerator Operator Manual - Linac/Booster Startup Santana, Michael B 2 4/27/2011
LS-OPM-0002 1/21/2005 X13 Elliptical Polarized Wiggler (EPW) Operations (Accelerator Operator Manual) Santana, Michael C 2 2/15/2011
LS-OPM-0003 8/16/2011 Accessing Booster Ring Sansone, Michael C 2 8/16/2011
LS-OPM-0004 10/30/2003 VUV Startup/Injection Process Santana, Michael C 2 11/8/2011
LS-OPM-0005 1/13/2000 Accelerator Operator Manual - Chapter 1: VUV Tune Measurement Santana, Michael B 2 1/6/2012
LS-OPM-0006 10/30/2003 Accelerator Operator Manual - VUV Global Orbit Correction Santana, Michael B 2 11/8/2011
LS-OPM-0007 5/11/2010 X-Ray Ring Injection Process (Initial Start-Up) Santana, Michael H 2 6/6/2012
LS-OPM-0008 2/22/2002 VUV Insertion Device Adjustments with Stored Beam Hidaka, Yoshiteru D 2 6/6/2012
LS-OPM-0009 10/23/2000 Accelerator Operator Manual - VUV Softramps Santana, Michael B 2 9/28/2010
LS-OPM-0010 5/11/2010 X-Ray Injection Process (Operation Mode) Santana, Michael F 2 6/6/2012
LS-OPM-0011 3/11/2002 X-Ray Global Orbit Correction (High Energy) Santana, Michael C 2 6/6/2012
LS-OPM-0012 4/27/2002 X13 Mini Gap Undulator (MGU) (Accelerator Operator Manual) Santana, Michael C 2 6/6/2012
LS-OPM-0013 10/23/2000 Accelerator Operator Manual - X-Ray Softramps Santana, Michael C 2 9/28/2010
LS-OPM-0016 7/1/2001 Accelerator Operator Manual - X-Ray Tune Measurement Santana, Michael B 2 7/11/2011
LS-OPM-0017 1/14/2000 VUV Tune Correction Santana, Michael A 2 1/6/2012
LS-OPM-0019 2/19/2002 RF - Troubleshooting VUVRF Ramirez, Gloria B 2 9/29/2010
LS-OPM-0020 2/10/2006 XRF2A Phase Lock Loop Error Ramirez, Gloria C 2 9/29/2010
LS-OPM-0021 2/10/2006 VUV Compressed Bunch Operations Ramirez, Gloria C 2 9/29/2010
LS-OPM-0022 2/10/2006 VUVRF2 Passive/Powered/Detuned Operations Ramirez, Gloria C 2 9/29/2010
LS-OPM-0024 7/26/2007 Accelerator Operator Manual - X-Ray Global & Local Orbit Correction Request Santana, Michael C 2 6/27/2011
LS-OPM-0025 2/19/2002 XRF1 Low Pressure Copper Resistivity Auxiliary Sensor Ramirez, Gloria B 2 9/29/2010
LS-OPM-0028 3/27/2004 Re-Homing (Calibrating) Undulator/Wiggler Gaps Santana, Michael C 2 6/6/2012
LS-OPM-0029 12/1/2004 Creating Low Emittance Preclose Response Matrix Santana, Michael B 2 11/4/2010
LS-OPM-0030 6/6/2004 XFR Penthouse Overtemp Alarm Response Ramirez, Gloria B 2 12/13/2010
LS-OPM-0031 7/5/2007 X17SCW Magnet Power Supply On/Off Procedure Santana, Michael C 2 4/27/2011
LS-OPM-0032 8/17/2011 X29 MGU Operation Santana, Michael B 2 8/17/2011
LS-OPM-0035 5/11/2010 Automatic - Inject and Ramp to 2.584 and 2.801 GeV Operator Aid Santana, Michael A 2 6/6/2012
LS-OPS-0001 3/10/2010 Securing the X-Ray Tunnel Buckley, Michael D 3 3/10/2010
LS-OPS-0002 2/24/2009 Securing the VUV Ring McDonald, Thomas E 3 6/13/2012
LS-OPS-0003 7/18/2008 Securing the LINAC/Booster Area Buckley, Michael C 3 7/18/2008
LS-OPS-0004 2/20/2003 Caution (Yellow) Tags Buckley, Michael C 5 2/6/2008
LS-OPS-0005 4/10/2008 Response to Emergencies at the NSLS (Operations Group Response) Chmiel, Robert K 1 5/27/2011
LS-OPS-0006 12/1/2008 Response to BNL Site Alerts and Emergencies Chmiel, Robert E 1 3/10/2011
LS-OPS-0006A 12/1/2008 Response to BNL Site Alerts and Emergencies Addendum - Quick Reference Chmiel, Robert D 1 3/10/2011
LS-OPS-0007 1/21/2005 NSLS Control Room Alarm System Zeitler, Edward C 2 8/18/2011
LS-OPS-0008 6/10/2004 Beamline Padlock Log System Buckley, Michael 1 3 8/27/2010
LS-OPS-0010 12/8/2004 X-Ray Beamline Front-End Safety Shutter Malfunction Santana, Michael D 3 2/15/2011
LS-OPS-0011 1/10/2006 Beam Line Attendance Requirements: Pink Cards Chmiel, Robert C 3 3/31/2009
LS-OPS-0012 8/18/2005 VUV Injection Time Limits Chmiel, Robert B 3 6/13/2012
LS-OPS-0013 6/15/2010 X-Ray Ring Plug Doors Procedure Marino, Philip E 2 6/15/2010
LS-OPS-0014 4/19/2010 NSLS Machine Operating Limits Santana, Michael G 3 4/19/2010
LS-OPS-0017 1/11/2008 Linac Modulator Emergency Response Chmiel, Robert C 2 1/26/2010
LS-OPS-0018 11/23/1999 Building 725 Fire Alarm Response Guidebook Chmiel, Robert B 3 4/8/2009
LS-OPS-0020 1/24/2002 Building 725 Remote Fire Alarm Panel Bell Delay Chmiel, Robert B 2 3/1/2010
LS-OPS-0021 3/8/2010 Operations Coordinator Handbook Marino, Philip D 3 3/8/2010
LS-OPS-0022 8/10/2008 Control Room Communications on BNL Fire Group Radio Frequency Klug, John C 2 6/20/2012
LS-OPS-0024 9/26/2007 Monitoring of the X17 Superconducting Wiggler Cryogenic Freudenburg, Richard B 5 9/26/2007
LS-OPS-0025 1/8/2008 X-Ray Current Limits Santana, Michael B 2 11/18/2011
LS-OPS-0026 8/10/2008 Weekly Fire Radio Check on BNL Fire Group Frequency Klug, John B 2 6/20/2012
LS-OPS-0027 6/10/2011 Response to Botulism Toxcin Experiment Emergencies Stiegler, Lori C 3 6/10/2011
LS-OPS-0028 1/19/2007 Procedure for preparing the X-Ray ring for Maintenance Santana, Michael B 2 2/15/2011
LS-OPS-0029 10/20/2009 NSLS VUV RF Smoke Detector Response Ramirez, Gloria C 1 2/22/2012
LS-OPS-0030 10/20/2009 NSLS X-Ray RF Smoke Detector Response Ramirez, Gloria D 1 10/12/2011
LS-OPS-0031 4/15/2010 Vacuum Procedures for Beamline U7A Hulbert, Steve D 3 4/15/2010
LS-OPS-0033 6/19/2001 Work in Areas Subject to Radiation from VUV Injection Chmiel, Robert A 2 6/25/2010
LS-OPS-0034 8/1/2001 Vacuum Procedures for Beamline X-12A Siddons, Peter B 2 8/8/2011
LS-OPS-0035 10/29/2001 Vacuum Procedures for Beamline X-6A Stojanoff, Vivian B 3 12/14/2010
LS-OPS-0036 11/1/2001 Vacuum Procedures for Beamline X-26C Schneider, Dieter B 3 3/9/2011
LS-OPS-0037 11/20/2009 Vacuum Procedures for Beamline U-1A Hulbert, Steve C 3 11/20/2009
LS-OPS-0038 1/1/2002 Vacuum Procedures for Beamline U2A Liu, Zhenxian B 3 8/8/2011
LS-OPS-0040 1/1/2002 Vacuum Procedures for Beamline U3C Klug, John B 3 11/10/2010
LS-OPS-0041 8/5/2010 Vacuum Procedures for Beamline U4A Hulbert, Steve C 3 8/5/2010
LS-OPS-0042 12/8/2011 Vacuum Procedures for Beamline U2B Hu, Jih-Perng C 3 12/8/2011
LS-OPS-0043 1/18/2002 Vacuum Procedures for Beamline X1B Hulbert, Steve B 3 3/1/2011
LS-OPS-0044 1/31/2002 Vacuum Procedures for Beamline X12C Sclafani, S. B 3 11/12/2009
LS-OPS-0045 2/15/2002 Vacuum Procedures for Beamline X10C Fareria, Larry B 3 11/9/2010
LS-OPS-0046 12/8/2011 Vacuum Procedures for Beamline X21B Hu, Jih-Perng C 3 12/8/2011
LS-OPS-0047 7/27/2007 Transuranic Materials Experiment; Operations Response to Emergencies Stiegler, Lori C 3 8/20/2010
LS-OPS-0048 4/15/2010 Vacuum Procedures for Beamline U4B Hulbert, Steve D 3 4/15/2010
LS-OPS-0049 12/19/2008 Oxygen Deficiency Hazard (ODH) Alarms in Bldg. 725 Ackerman, Andrew E 3 12/19/2008
LS-OPS-0050 2/13/2004 Vacuum Procedures for Beamline U5UA Vescovo, Elio C 3 1/22/2007
LS-OPS-0051 1/27/2010 User Waste Generation Notification Klaus, Keith D 3 1/27/2010
LS-OPS-0052 3/1/2010 Requirements for Working in the X-Ray Tunnel Zafonte, Frank C 3 3/1/2010
LS-OPS-0053 6/19/2008 Vacuum Procedures for Beamline U-7B Hulbert, Steve C 3 5/23/2011
LS-OPS-0055 12/11/2005 Vacuum Procedures for Beamline U-9B Trunk, John C 3 1/5/2012
LS-OPS-0056 1/13/2006 Vacuum Procedures for Beamline X11-B Karlin, Barry C 3 12/16/2011
LS-OPS-0057 9/25/2002 Fire Alarm Testing Public Address Anouncement Klug, John A 2 11/19/2010
LS-OPS-0058 11/15/2002 Vacuum Procedures for Beamline X-6B Stanic, Vesna B 3 1/4/2012
LS-OPS-0059 5/23/2003 Vacuum Procedures for Beamline X-17C Hu, Jingzhu B 3 4/9/2009
LS-OPS-0061 7/11/2003 Vacuum Procedures for Beamline U13UB Hulbert, Steve B 3 6/9/2009
LS-OPS-0062 2/20/2003 Vacuum Procedures for Beamline X-19A Klug, John B 3 3/30/2009
LS-OPS-0063 4/4/2003 Vacuum Procedures for Beamline X-17B1, B2, & B3 Zhong, Zhong B 3 11/10/2009
LS-OPS-0064 4/17/2012 Vacuum Procedures for Beamline U-8B Marino, Philip C 3
LS-OPS-0065 12/22/2003 Vacuum Procedures for Beamline X29 Sullivan, Michael A 3 1/15/2010
LS-OPS-0068 1/10/2007 List of Approved Venters of Beamline U7A Sect. IX C without OPCO Presence Hulbert, Steve B 3 4/6/2010
LS-OPS-0069 4/6/2004 Vacuum Procedures for Beamlie X21A Lamarra, Steven B 3 3/3/2010
LS-OPS-0073 12/12/2007 Vacuum Procedures for Beamline X-8A Keister, Jeffrey D 3 11/4/2010
LS-OPS-0074 6/30/2008 Vacuum Procedures for Beamline X-8C Dvorak, Joseph C 3 8/3/2011
LS-OPS-0075 8/17/2011 Vacuum Procedures for Beamline X1A Starr, David E 3 8/17/2011
LS-OPS-0076 6/15/2006 Vacuun Procedures for Beamline X13A Sanchez Hanke, Cecilia D 3 6/23/2009
LS-OPS-0078 10/19/2009 Vacuum Procedures for Beamline X24A Karlin, Barry D 3 10/19/2009
LS-OPS-0079 9/29/2004 Vacuum Procedures for Beamline U-15A Hulbert, Steve B 3 3/1/2011
LS-OPS-0080 2/11/2010 Vacuum Procedures for Beamline X-27A Nintzel, Gary D 3 2/11/2010
LS-OPS-0081 1/28/2005 Vacuum Procedures for Beamline X-24C Kjornrattanawanich, B. B 3 12/23/2010
LS-OPS-0082 4/11/2005 Vacuum Procedures for Beamline X-23A2 Karlin, Barry B 3 4/21/2011
LS-OPS-0083 6/29/2005 Vacuum Procedures for Beamline X-13B Hulbert, Steve B 3 9/22/2011
LS-OPS-0084 9/24/2009 Vacuum Procedures for Beamline X16C Hulbert, Steve C 3 9/24/2009
LS-OPS-0085 5/26/2005 MOU Between NSLS & EP Site Shift Supervisors Responding to LS Calls (Call-in list) Kiss, Robert A 3 8/19/2008
LS-OPS-0086 3/24/2008 Vacuum Procedures for Beamline U-12A Hulbert, Steve C 3 3/3/2011
LS-OPS-0087 3/3/2011 X-Ray Ring Plug Doors Procedure for X29 & X30 Marino, Philip B 2 3/3/2011
LS-OPS-0088 3/13/2009 Vacuum Procedures for Beamline X28C (note: John Klug is a reviewer of this doc.) Sullivan, Michael C 3 6/6/2012
LS-OPS-0090 3/14/2006 Vacuum Procedures for Beamline X-16B Nelson, Christie B 3 2/5/2009
LS-OPS-0092 4/25/2007 Machine Startup/Shutdown Checklist Santana, Michael B 2 6/27/2011
LS-OPS-0093 7/26/2006 Vacuum Procedures for Beamline X-20B jordan-sweet, jean B 3 6/8/2012
LS-OPS-0094 8/17/2006 Vacuum Procedures for Beamline X-3B Sullivan, Michael B 3 6/6/2012
LS-OPS-0095 8/18/2006 Vacuum Procedures for Beamline X3A Sullivan, Michael B 3 6/6/2012
LS-OPS-0096 7/31/2009 Operations Group Response to Chipmunk Monitor data on NSLS Video Channel 28 Stiegler, Lori 2 3 7/31/2009
LS-OPS-0098 1/4/2007 Vacuum Procedures for Beamline X27C Rong, L. B 3 11/12/2009
LS-OPS-0099 1/4/2007 Vacuum Procedures for Beamline X18B Khalid, Syed B 3 2/17/2010
LS-OPS-0100 4/14/2008 Vacuum Procedures for Beamline X7B Hanson, Jonathan C 3 2/22/2011
LS-OPS-0101 1/8/2008 VUV Ring Current Limits Santana, Michael B 2 11/18/2011
LS-OPS-0102 3/20/2007 Vacuum Procedures for Beamline X-25A Lamarra, Steven B 3 3/3/2010
LS-OPS-0103 3/24/2011 NSLS Emergency Call-In List Zitvogel, Emil H 1 3/24/2011
LS-OPS-0104 1/22/2010 Enabling NSLS X-Ray Beamlines Marino, Philip C 1 3/29/2011
LS-OPS-0105 1/22/2010 Enabling NSLS VUV Beamlines Marino, Philip C 1 3/29/2011
LS-OPS-0106 1/22/2010 Vacuum Bleedups on NSLS Beamline Marino, Philip B 1 3/29/2011
LS-OPS-0108 1/25/2010 Opening and Closing NSLS Beamline Front Ends Marino, Philip B 1 3/27/2011
LS-OPS-0109 3/8/2011 Posting Safety Approval Forms Using PASS Marino, Philip C 1 3/8/2011
LS-OPS-0110 3/1/2010 Maintenance Management Program Santana, Michael B 3 3/1/2010
LS-OPS-0112 5/1/2011 NSLS RF and Power Systems Group Emergency Call-In List Ramirez, Gloria D 1 6/6/2012
LS-OPS-0113 4/22/2011 SDL Emergency Call-In List Heese, Richard C 1 4/22/2011
LS-OPS-0114 3/13/2008 Vacuum Procedures for Beamline X18A Ehrlich, Steve B 3 2/15/2011
LS-OPS-0115 11/3/2008 Vacuum Procedures for Beamline X-9A Yang, Lin A 3 10/12/2011
LS-OPS-0116 12/22/2008 Vacuum Procedures for Beamline X-16A Cai, Y A 3 11/17/2011
LS-OPS-0117 1/12/2009 X-Ray Equipment Area Temperature Alarm - Response Ramirez, Gloria A 1 6/6/2012
LS-OPS-0120 7/13/2010 Response to Computer Room HVAC Alarms Buckley, Michael B 3 7/13/2010
LS-OPS-0121 2/10/2010 Vacuum Procedures for Beamline U-4IR Carr, Larry B 3 2/10/2010
LS-OPS-0122 2/10/2010 Vacuum Procedures for Beamline U-10B Carr, Larry B 3 2/10/2010
LS-OPS-0123 1/4/2010 Vacuum Procedures for Beamline U-11 Trunk, John B 3 1/4/2010
LS-OPS-0124 2/22/2010 Vacuum Procedures for Beamline U-12IR Carr, Larry B 3 2/22/2010
LS-OPS-0125 5/25/2011 NSLS Mechanical System Group Emergency Call-In List Mortazavi, Payman C 1 5/25/2011
LS-OPS-0126 4/9/2010 Control Room Response to a Modulator Integrated Current Detector Interlock Trip Santana, Michael A 1 6/6/2012
LS-OPS-0127 5/11/2010 Response to Operation Problems Due to Network Malfunctioning Santana, Michael A 1 6/6/2012
LS-OPS-0128 4/20/2010 Qualified NSLS Operations Coordinators Santana, Michael C 3 4/20/2010
LS-OPS-0129 4/20/2010 Qualified NSLS Accelerator Operators Santana, Michael B 3 4/20/2010
LS-OPS-0130 6/2/2010 Vacuum Procedures for Beamline X-2B Fareria, Larry B 3 6/2/2010
LS-OPS-0131 6/10/2010 Vacuum Procedures for Beamline X4A Abramowitz, Randy B 3 6/10/2010
LS-OPS-0132 6/10/2010 Vacuum Procedures for Beamline X4C Abramowitz, Randy B 3 6/10/2010
LS-OPS-0133 8/5/2010 Vacuum Procedures for Beamline X7A Greene, Richard B 3 8/5/2010
LS-OPS-0134 9/1/2010 Vacuum Procedures for Beamline X-10A Bennett, Steve B 3 9/1/2010
LS-OPS-0135 9/1/2010 Vacuum Procedures for Beamline X-10B Bennett, Steve B 3 9/10/2010
LS-OPS-0136 12/1/2010 Vacuum Procedures for Beamline X-17A Lamarra, Steven A 3 12/1/2010
LS-OPS-0137 2/23/2011 Vacuum Procedures for Beamline X11A Pandya, Kaumudi B 3 2/23/2011
LS-OPS-0138 1/6/2011 NSLS LBD2 Magnet Shunt Switch Procedure Ramirez, Gloria A 2 1/6/2011
LS-OPS-0139 3/15/2011 Vacuum Procedures for Beamline X14A Bai, Jianming B 3 3/15/2011
LS-OPS-0140 3/15/2011 Vacuum Procedures for Beamline X26A Wirick, Sue B 3 3/15/2011
LS-OPS-0141 4/12/2011 Vacuum Procedures for Beamline X15A Zhong, Zhong B 3 4/12/2011
LS-OPS-0142 6/27/2011 Vacuum Procedures for Beamline X15B Northrup, Paul B 3 6/27/2011
LS-OPS-0143 4/14/2011 Procedure for Off Hours Filling of X13A Chamber with LN2 in Building 726 Chmiel, Robert 1 2 4/14/2011
LS-OPS-0144 5/5/2011 Vacuum Procedures for Beamline X19C Raghothamachar, Balaji B 3 5/5/2011
LS-OPS-0145 8/22/2011 Vacuum Procedures for Beamline X20A jordan-sweet, jean B 3 8/22/2011
LS-OPS-0146 8/22/2011 Vacuum Procedures for Beamline X20C jordan-sweet, jean B 3 8/22/2011
LS-OPS-0147 7/25/2011 NSLS Control Room Safety Spare Keys Cabinet Access McDonald, Thomas 1 1 7/25/2011
LS-OPS-0151 2/28/2012 Vacuum Procedures for Beamline X-27B Klug, John B 3 2/28/2012
LS-OPS-0152 4/23/2012 Yang, Lin B 3 4/23/2012
LS-PCL-0003 12/8/2010 X2B Padlock Index Marino, Philip B 3 12/8/2010
LS-PCL-0004 12/15/2010 X3A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0005 12/15/2010 X3B Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0008 5/6/2010 X4A Padlock Index Marino, Philip B 3 5/6/2010
LS-PCL-0009 12/15/2010 X4C Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0011 12/15/2010 X6A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0012 12/15/2010 X6B Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0013 12/15/2010 X7A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0014 6/27/2011 X7B Padlock Index Marino, Philip D 3 6/27/2011
LS-PCL-0015 12/15/2010 X8A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0016 1/11/2011 X8C Padlock Index Marino, Philip B 3 1/11/2011
LS-PCL-0017 4/17/2012 X9A Padlock Index Marino, Philip C 3 2/28/2012
LS-PCL-0019 12/15/2010 X10A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0020 12/15/2010 X10B Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0021 12/15/2010 X10C Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0022 12/15/2010 X11A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0023 12/15/2010 X11B Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0024 5/6/2010 X12A Padlock Index Marino, Philip C 3 5/6/2010
LS-PCL-0025 5/6/2010 X12B Padlock Index Marino, Philip B 3 5/6/2010
LS-PCL-0026 12/15/2010 X12C Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0028 8/25/2010 X13B Padlock Index Marino, Philip E 3 8/25/2010
LS-PCL-0029 12/15/2010 X14A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0031 12/15/2010 X15A Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0032 12/15/2010 X15B Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0033 3/18/2009 X16A Padlock Index McDonald, Thomas A 3 3/18/2009
LS-PCL-0034 12/15/2010 X16B Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0035 12/15/2010 X16C Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0037 11/1/2010 X17B Padlock Index Marino, Philip C 3 11/1/2010
LS-PCL-0039 1/13/2010 X17C Padlock Index Marino, Philip B 3 1/13/2010
LS-PCL-0040 6/27/2011 X18A Padlock Index Marino, Philip E 3 6/27/2011
LS-PCL-0041 12/15/2010 X18B Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0043 5/6/2010 X19C Padlock Index Marino, Philip B 3 5/6/2010
LS-PCL-0044 12/15/2010 X20A Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0045 1/25/2010 X20B Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0046 12/15/2010 X20C Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0047 1/6/2010 X21A Padlock Index Marino, Philip D 3 1/6/2010
LS-PCL-0048 1/25/2010 X22A Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0049 1/25/2010 X22B Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0050 1/25/2010 X22C Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0051 12/15/2010 X23A2 Padlock Index Marino, Philip D 3 12/15/2010
LS-PCL-0053 1/25/2010 X23B Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0056 1/6/2010 X25A Padlock Index Marino, Philip E 3 1/6/2010
LS-PCL-0057 1/25/2010 X26A Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0058 1/25/2010 X26C Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0059 12/15/2010 X27A Padlock Index Marino, Philip E 3 12/15/2010
LS-PCL-0060 12/15/2010 X27C Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0061 1/25/2010 X27C Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0062 12/15/2010 X28B Padlock Index Marino, Philip B 3 12/15/2010
LS-PCL-0063 12/15/2010 X28C Padlock Index Marino, Philip C 3 12/15/2010
LS-PCL-0086 1/25/2010 X29A Padlock Index Marino, Philip B 3 1/25/2010
LS-PCL-0087 11/1/2010 X17A Padlock Index Marino, Philip A 3 11/1/2010
LS-PCL-0088 9/12/2011 X1A1 Padlock Index Marino, Philip A 3 9/12/2011
LS-PL-Call-In-0001 2/17/2004 Emergency Electrician Call-In List Boerner, Albert A 2 10/13/2011
LS-PPS-0001 4/16/2002 X-Ray Injection Warning Sign Test Buckley, Michael A 3 3/25/2011
LS-PPS-0002 3/20/2006 General Beamline Radiological Interlock Test McDonald, Thomas C 3 6/13/2012
LS-PPS-0003 4/14/2009 X20A Radiological Interlock Test McDonald, Thomas D 3 6/13/2012
LS-PPS-0004 3/7/2002 X15B Beamline Radiological Interlock Test (Hutch Mode) Buckley, Michael A 3 3/25/2011
LS-PPS-0005 3/22/2011 X17B1 Radiological Interlock Test Buckley, Michael H 3 3/22/2011
LS-PPS-0006 12/14/2010 X17C Radiological Interlock Test Buckley, Michael E 3 12/14/2010
LS-PPS-0007 3/22/2011 X17 Transport Hutch Radiological Interlock Test Buckley, Michael E 3 3/22/2011
LS-PPS-0010 1/22/2009 Hutchless Beamline Radiological Interlock Test McDonald, Thomas C 3 6/13/2012
LS-PPS-0013 4/23/2010 LINAC Booster Radiological Interlock Test Buckley, Michael H 3 4/23/2010
LS-PPS-0014 12/25/2011 SDL Radiological Interlock Test McDonald, Thomas G 3 12/25/2011
LS-PPS-0015 3/30/2010 SDL Linac/MHL Laser Interlock Test Buckley, Michael i 3 3/30/2010
LS-PPS-0016 6/10/2004 Booster Operation Warning Sign Test Buckley, Michael C 3 7/21/2010
LS-PPS-0017 4/16/2002 X1A Radiological Interlock Test Buckley, Michael A 3 3/25/2011
LS-PPS-0022 1/5/2009 VUV Ring Radiological Interlock Test McDonald, Thomas H 3 6/13/2012
LS-PPS-0023 5/26/2011 X-Ray Ring Radiological Interlock Test Buckley, Michael L 3 5/26/2011
LS-PPS-0024 9/21/2010 X-Ray Ring Interlock Chain Isolation Test Buckley, Michael D 3 9/21/2010
LS-PPS-0025 1/6/2006 U14B Radiological Interlock Test McDonald, Thomas C 3 6/13/2012
LS-PPS-0026 6/14/2002 X-Ray Beamline Interlock Reach Back Test McDonald, Thomas A 3 6/13/2012
LS-PPS-0027 6/14/2002 X14B Radiological Interlock Test Buckley, Michael A 3 9/10/2008
LS-PPS-0030 4/7/2005 SDL Modulator High Voltage Power Supply Interlock Test Procedure Orr, Ewart B 3 4/22/2011
LS-PPS-0031 3/17/2003 NSLS Modulator High Voltage Power Supply Interlock Test Procedure McDonald, Thomas A 3 6/13/2012
LS-PPS-0032 12/21/2010 X17B2 Radiological Interlock Test Buckley, Michael E 3 12/21/2010
LS-PPS-0033 5/24/2011 X17B3 Radiological Interlock Test Buckley, Michael E 3 5/24/2011
LS-PPS-0034 6/20/2003 X28C Radiological Interlock Test Buckley, Michael A 3 5/3/2010
LS-PPS-0035 1/23/2007 U2A Laser Interlock Test Buckley, Michael C 3 5/3/2010
LS-PPS-0036 5/4/2007 U6 Laser Interlock Test Buckley, Michael B 3 5/3/2010
LS-PPS-0037 6/1/2011 Interlock Test Personnel Call-In List Chmiel, Robert D 1 6/13/2012
LS-PPS-0039 4/5/2006 X21A1/A3 Radiological Interlock Test McDonald, Thomas B 3 6/13/2012
LS-PPS-0040 12/11/2009 SDL End Station Laser Area Interlock Test McDonald, Thomas C 2 6/13/2012
LS-PPS-0041 6/22/2006 X13B Beamline Radiological Interlock Test Buckley, Michael A 3 5/3/2010
LS-PPS-0043 5/1/2007 U13 Laser Interlock Test Buckley, Michael A 3 5/3/2010
LS-PPS-0044 10/12/2009 X9A Beamline Radiological Interlock Test Buckley, Michael B 3 10/12/2009
LS-PPS-0045 6/2/2009 X21A1 Laser Interlock Test McDonald, Thomas A 3 6/13/2012
LS-PPS-0046 5/4/2011 X17B3 Laser Interlock Test Buckley, Michael B 3 5/4/2011
LS-PPS-0047 12/14/2010 X17A Radiological Interlock Test Buckley, Michael A 3 12/14/2010
LS-PSG-M002 5/15/2010 NSLS Klystron Modulator Mantenance Procedure Ramirez, Gloria B 2 6/6/2012
LS-PSG-S001 11/22/2010 NSLS Modulator PFN Tuning Procedure Ramirez, Gloria D 2 11/22/2010
LS-PSG-S002 6/15/2011 NSLS Modulator High Voltage LOTO Ramirez, Gloria F 2 6/15/2011
LS-PSG-S003 5/15/2010 NSLS Main Magnet Power Supply LOTO Ramirez, Gloria E 2 5/15/2010
LS-PSG-S004 5/15/2010 NSLS Transfer Line Magnet Power Supply LOTO Ramirez, Gloria E 2 5/15/2010
LS-PSG-S005 5/15/2010 NSLS Pulsed Magnet LOTO Ramirez, Gloria D 2 5/15/2010
LS-PSG-S006 5/15/2010 NSLS XQD Trim Rack Access Ramirez, Gloria C 2 5/15/2010
LS-PSG-S009 5/15/2010 NSLS Linac Pump Station LOTO Ramirez, Gloria C 2 5/15/2010
LS-PSG-S010 5/15/2010 NSLS EPW LOTO Ramirez, Gloria C 2 5/15/2010
LS-PSG-S012 5/15/2010 NSLS Kicker Lab Pulsed Magnet Test Procedure Zuhoski, Peter B 2 5/15/2010
LS-PSG-T001 5/15/2010 NSLS Ring Access for Magnet Measurements Ramirez, Gloria D 1 5/25/2011
LS-PSG-T002 5/15/2010 Hi-Potting NSLS Ring Magnets Ramirez, Gloria D 2 5/15/2010
LS-PSG-T003 12/15/2010 XQD Trim Bench Test Ramirez, Gloria D 5 12/15/2010
LS-PSG-T004 2/10/2005 XQD Trim Installation Checkout Procedure Zuhoski, Peter D 5 4/9/2010
LS-PSG-T005 5/15/2010 NSLS Kicker Test Procedure - In Place Ramirez, Gloria C 2 5/15/2010
LS-PSG-T006 10/30/2007 Kicker Lab Interlock Test Checklist Zuhoski, Peter B 3 12/16/2010
LS-PSG-T007 5/15/2010 In Place Booster Kicker Test With LINAC Booster Security Ramirez, Gloria C 2 5/15/2010
LS-PSG-T008 3/23/2009 NSLS Modulator Emergency Stop Test Procedure Ramirez, Gloria A 1 10/12/2011
LS-PSG-T009 11/22/2010 NSLS Modulator Smoke Detector Test Ramirez, Gloria B 2 11/22/2010
LS-PSG-T010 5/20/2009 NSLS Modulator PFN Arc Detector Test Procedure Ramirez, Gloria A 1 10/12/2011
LS-QAP-0417 3/29/2010 Installation Readiness Review Buckley, Michael A 3 3/29/2010
LS-QAP-0802 12/6/2006 NSLS Family Assessment Tracking System Instructions Buckley, Michael D 3 5/3/2010
LS-RF-0001 10/10/2010 Preventative Maintenance Procedure for 3kW Amplifiers Ramirez, Gloria E 2 10/10/2010
LS-RF-0002 10/10/2010 Preventative Maintenance Procedure for 50kW Amplifier Ramirez, Gloria E 2 10/10/2010
LS-RF-0003 10/10/2010 Preventative Maintenance Procedure - Cord/Plug Connected RF Equipment Ramirez, Gloria C 2 10/10/2010
LS-RF-0004 10/10/2010 Preventative Maintenance Procedure for NSLS RF 125kW Amplifier Ramirez, Gloria E 2 10/10/2010
LS-RF-0005 10/10/2010 Preventative Maintenance Procedure for 3kW Amplifier Plate Ramirez, Gloria E 2 10/10/2010
LS-RF-0006 10/10/2010 Preventative Maintenance Procedure for 50kW and 125kW Amplifier Plate Power Supplies Ramirez, Gloria E 2 10/10/2010
LS-RF-0007 7/1/2002 Preventive Maintenance Procedure for RF Cavity Security Gates System Ramirez, Gloria A 1 2/22/2012
LS-RF-0011 11/20/2010 NSLS RF System 3Kw Amplifier LOTO Ramirez, Gloria H 2 11/20/2010
LS-RF-0012 10/20/2009 NSLS RF System 3KW Amplifier Plate Power Supply LOTO Ramirez, Gloria E 2 11/22/2010
LS-RF-0015 10/20/2009 NSLS RF System 50KW Amplifier LOTO Ramirez, Gloria F 2 11/19/2010
LS-RF-0016 10/20/2009 NSLS RF System 50 KW Amplifier Plate Power Supply LOTO Ramirez, Gloria F 2 11/19/2010
LS-RF-0017 11/20/2010 NSLS RF System 125Kw Amplifier LOTO Ramirez, Gloria F 2 11/20/2010
LS-RF-0018 10/20/2009 NSLS RF System 125kw Amplifier Plate Power Supply LOTO Ramirez, Gloria F 2 11/19/2010
LS-RF-0019 10/20/2009 NSLS RF System Coax Work LOTO Ramirez, Gloria C 1 12/7/2011
LS-RF-0020 9/18/2003 Re-Certification of XRF Test Area ("Blockhouse") Security Interlock System Ramirez, Gloria A 1 10/12/2011
LS-RF-0021 9/18/2003 Operations of XRF Test System when loaded by an RF Cavity Ramirez, Gloria A 1 2/22/2012
LS-RF-0024 4/7/2005 Transformer Test Procedure (Hammond PT25QG) Zuhoski, Peter A 2 9/1/2011
LS-RF-0025 12/15/2010 Eimac Tube Removal and Installation Ramirez, Gloria A 2 12/15/2010
LS-SCL-0001 5/6/2010 X12A Safety Checklist Marino, Philip C 3 5/6/2010
LS-SCL-0002 5/6/2010 X19A Safety Checklist Marino, Philip C 3 5/6/2010
LS-SCL-0003 9/11/2011 X1A Safety Checklist Marino, Philip F 3 9/11/2011
LS-SCL-0004 8/5/2011 X1B Safety Checklist Jew, William E 3 8/5/2011
LS-SCL-0005 5/6/2010 X2B Safety Checklist Marino, Philip D 3 5/6/2010
LS-SCL-0009 10/24/2010 X17A Beamline Safety Checklist Marino, Philip A 3 10/24/2010
LS-SCL-0010 5/6/2010 X4A Safety Checklist Marino, Philip C 3 5/6/2010
LS-SCL-0011 5/6/2010 X4C Safety Checklist Marino, Philip D 3 5/6/2010
LS-SCL-0013 5/6/2010 X6A Safety Checklist Marino, Philip C 3 5/6/2010
LS-SCL-0014 5/6/2010 X6B Safety Checklist Marino, Philip C 3 5/6/2010
LS-SCL-0015 5/24/2010 X7A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0016 7/22/2011 X7B Safety Checklist Marino, Philip E 3 7/22/2011
LS-SCL-0017 5/24/2010 X8A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0018 1/10/2011 X8C Safety Checklist Marino, Philip D 3 1/10/2011
LS-SCL-0019 6/16/2009 X9A Safety Checklist McDonald, Thomas C 3 6/8/2009
LS-SCL-0021 5/24/2010 X10A Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0022 5/24/2010 X10B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0023 5/24/2010 X10C Safety Checklist Marino, Philip C 31 5/24/2010
LS-SCL-0024 5/24/2010 X11A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0025 5/24/2010 X11B Safety Checkist Marino, Philip C 3 5/24/2010
LS-SCL-0026 5/24/2010 X12B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0027 5/24/2010 X12C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0028 5/24/2010 X13A/B Safety Checklist Marino, Philip E 3 5/10/2010
LS-SCL-0030 5/24/2010 X14A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0033 5/24/2010 X15B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0034 4/13/2009 X16A Safety Checklist McDonald, Thomas A 3 4/13/2009
LS-SCL-0035 5/24/2010 X16B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0036 5/24/2010 X16C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0037 5/24/2010 X17B1 Safety Checklist Marino, Philip C 3 5/20/2010
LS-SCL-0038 7/22/2011 X17B2 Safety Checklist Marino, Philip D 3 5/24/2011
LS-SCL-0039 5/24/2010 X17B3 Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0040 5/24/2010 X17C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0041 6/27/2011 X18A Safety Checklist Marino, Philip D 3 6/27/2011
LS-SCL-0042 5/24/2010 X18B Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0043 5/24/2010 X19C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0044 5/24/2010 X20A Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0045 5/24/2010 X20B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0046 5/24/2010 X20C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0047 5/24/2010 X21A3 Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0048 3/31/2009 X22A Safety Checklist McDonald, Thomas C 3 3/31/2009
LS-SCL-0049 5/24/2010 X22B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0050 5/24/2010 X22C Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0051 9/2/2009 X23A2 Safety Checklist Marino, Philip F 3 9/2/2009
LS-SCL-0053 5/24/2010 X23B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0054 5/24/2010 X24A Safety Checklist Marino, Philip E 3 5/24/2010
LS-SCL-0055 5/24/2010 X24C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0056 5/24/2010 X25A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0057 5/24/2010 X26A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0058 5/24/2010 X26C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0059 5/24/2010 X27A Safety Checklist Marino, Philip F 3 5/24/2010
LS-SCL-0060 5/24/2010 X27C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0061 5/24/2010 X27C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0062 5/24/2010 X28B Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0063 9/15/2010 X28C Safety Checklist Marino, Philip E 3 9/15/2010
LS-SCL-0064 5/24/2010 U1A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0065 5/24/2010 U2A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0066 5/24/2010 U2B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0067 5/24/2010 U3B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0068 5/24/2010 U3C Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0069 5/24/2010 U4A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0070 5/24/2010 U4B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0071 5/24/2010 U4IR Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0072 5/24/2010 U5UA Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0073 5/24/2010 U7A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCl-0074 5/24/2010 U7B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0075 5/24/2010 U8B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0077 5/24/2010 U9B Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0078 5/24/2010 U10A/B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0080 5/24/2010 U11A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0081 5/24/2010 U12A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0082 5/24/2010 U12IR Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0083 5/24/2010 U13UB Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0085 5/24/2010 U15A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0086 5/24/2010 X29A Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0087 5/24/2010 X21A1 Safety Checklist Marino, Philip D 3 5/24/2010
LS-SCL-0088 5/24/2010 U16B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0089 5/24/2010 X3A Safety Checklist Marino, Philip C 3 5/24/2010
LS-SCL-0090 5/24/2010 X3B Safety Checklist Marino, Philip C 3 5/24/2010
LS-SDL-0001 7/18/2006 SDL Conduct of Operations Buckley, Michael B 3 7/18/2006
LS-SDL-0002 10/1/2010 Source Development Laboratory (SDL) Safety Assessment Document (SAD) Ackerman, Andrew H 5 10/1/2010
LS-SDL-0003 2/5/2007 The SDL Operator Training Certification Checklist Wang, Xijie C 3 5/4/2010
LS-SDL-0004 12/19/2008 SDL Shielding Check List Wang, Xijie J 3 12/19/2008
LS-SDL-0005 10/22/2004 SDL Search Procedure Orr, Ewart C 5 12/13/2010
LS-SDL-0006 10/22/2004 SDL Radiation Interlock Orr, Ewart B 3 2/22/2011
LS-SDL-0007 10/22/2004 SDL Laser Interlock Orr, Ewart C 3 2/22/2011
LS-SDL-0008 10/20/2009 SDL Modulator High Voltage Lockout Tagout Ramirez, Gloria D 2 10/12/2011
LS-SDL-0009 12/19/2008 RF Conditioning Checklist for DUV-FEL Linac Operation Bldg. 729 Goel, Aditya C 3 12/19/2008
LS-SDL-0010 6/1/2011 SDL Crane/Clean Room Lock Procedure Ramirez, Gloria C 3 6/1/2011
LS-SDL-0011 10/20/2009 SDL Linac Start-up/Shut-down Procedure Ramirez, Gloria B 1 5/27/2011
LS-SDL-0012 9/9/2002 SDL Process Pumps Start-Up/Shut-down Beauman, Ron C 5 7/26/2007
LS-SDL-0013 2/4/2009 Response to SDL Linac Modulator Malfunction Goel, Aditya C 3 2/4/2009
LS-SDL-0014 7/28/2009 SDL Laser Safety Procedure Shen, Yuzhen C 3 7/28/2009
LS-SDL-0015 10/20/2009 Work on Power Supply Powered by 208 VAC Ramirez, Gloria D 1 10/12/2011
LS-SDL-0016 10/21/2001 SDL Enclosure Inspection Checklist Johnson, Erik B 5 11/18/2011
LS-SDL-0017 7/18/2006 Shielding Inspection Procedure Singh, Pooran B 3 7/27/2009
LS-SDL-0019 9/23/2010 Source Development Lab (SDL) Accelerator Safety Envelope (ASE) Ackerman, Andrew D 5 9/23/2010
LS-SDL-0022 3/24/2010 SDL Pre-Engineered: Lead Shield Blocks Weighing 409 Pounds Kiss, Robert 5 3 3/24/2010
LS-SDL-0023 10/20/2004 The Commissioning Plan for the DUV-FEL 300 MeV Operation (SDL Accelerator Readiness Review) Wang, Xijie B 5 11/10/2009
LS-SDL-0024 3/24/2010 SDL Pre-Engineered Lift SDL-505.04-001Top and Side Plates Kiss, Robert C 3 3/24/2010
LS-SDL-0025 3/24/2010 SDL Pre-Engineered Lift SDL-505.49 Top & South Sdie Plates Kiss, Robert C 3 3/24/2010
LS-SDL-0026 3/24/2010 SDL Pre-Engineered Lift SDL-505.04-001 North Side Plates Kiss, Robert D 3 3/24/2010
LS-SDL-0027 3/24/2010 SDL Pre-Engineered Lift SDL 505.05 North Side Plates Kiss, Robert D 3 3/24/2010
LS-SDL-0029 3/24/2010 SDL Pre-Engineered Lift SDL-505.05-049 West End Plates Kiss, Robert D 3 3/24/2010
LS-SDL-0030 4/22/2011 DUV-FEL Operator Response to HPI Beam Loss and Chipmunk Radiation Monitors Heese, Richard C 2 4/22/2011
LS-SDL-0031 3/12/2012 SDL Laser Safety Procedure - Deep Ultraviolet Free Electron Laser, Experiment End Station Shen, Yuzhen 11 1 3/12/2012
LS-SDL-0032 3/21/2012 SDL Laser Safety Procedure - SDL Drive Laser & Accelerator Enclosure Beams Shen, Yuzhen 13 1 3/21/2012
LS-SDL-0033 2/9/2011 Laser Operator for the SDL-Training Certification Checklist - Level I & II - SDL Laser Safety Procedure Shen, Yuzhen G 1 2/16/2012
LS-SDL-0034 10/20/2005 Temporary Restrictions to DUV-FEL Operating Envelope Ackerman, Andrew B 3 5/4/2009
LS-SDL-0035 10/20/2009 NSLS-SDL Linac Modulaor PFN Tuning and Troubleshooting Ramirez, Gloria B 5 11/22/2010
LS-SDL-0036 11/16/2009 SDL Operation Check List Wang, Xijie E 2 11/16/2009
LS-SDL-0037 8/10/2011 SDL Modulator Smoke Detector Test Procedure Goel, Aditya D 2 8/10/2011
LS-SDL-0039 10/20/2009 SDL Klystron Installation/Removal Ramirez, Gloria B 2 10/12/2011
LS-SDL-0040 10/16/2009 SDL 4 Wire Power Supply Calibration Procedure Pedersen, Ken A 5 10/16/2009
LS-SDL-0041 4/26/2010 Control Room Response to a Modulator Integrated Current Detector Interlock Trip Heese, Richard A 1 4/22/2011
LS-SDL-0042 6/1/2010 SDL Modulator PFN Inspection Procedure Ramirez, Gloria A 2 6/6/2012
LS-SDL-0043 12/9/2011 SDL UED Operation Check List Wang, Xijie B 2 12/9/2011
LS-SDL-0044 12/9/2011 SDL UED Shielding Checklist Wang, Xijie B 2 12/9/2011
LS-UA-0001 10/29/2009 NSLS User Access Policy Nasta, Kathy L 1 3/7/2012
LS-UA-0002 8/24/2009 NSLS User Access Procedures Nasta, Kathy D 2 8/24/2009
LT-C-ESH-PRC-001 2/2/2012 Contingency Plan for 90-Day Waste Accumulation Area - Building 740 Ackerman, Andrew 1 3 2/2/2012
LT-ESH-PRM-9.0.5 1/18/2011 Building 945 Local Emergency Plan Chmiel, Robert 4 1 1/18/2011
PS-ESH-0001 11/1/2010 Reporting of Events at Non-Construction Sites Buckley, Michael A 1 12/2/2011
PS-ESH-0020 5/23/2012 Contingency Plan for 90-Day Waste Accumulation Area - Building 703 East Wing Laboratories Ackerman, Andrew 2 3 5/23/2012
PS-ESH-0053 6/8/2012 Operation of Nano-material Glove Box in Bldg 725 Room 1-128 Stiegler, Lori 1 2 6/8/2012
PS-ESH-0057 6/8/2012 Laser Safety Program Documention X21 PLD Stiegler, Lori 1 1 6/8/2012
PS-ESH-0059 6/6/2012 Frequently Asked Questions About Environmental Management Systems Stiegler, Lori 1 1 6/6/2012
PS-ESH-0060 6/6/2012 Frequently Asked Questions about Occupational Health & Safety Management System (OHSAS 18001) Stiegler, Lori 2 1 6/6/2012
PS-ESH-0061 6/15/2012 Stiegler, Lori 1 3
PS-ESH-0064 5/11/2012 Ventilation Check Procedure for Protein Crystallography Stiegler, Lori 1 3 5/11/2012
PS-ESH-0067 6/11/2012 NSLS Operations Group Response to X21 Ventilation Alarm Stiegler, Lori 1 3
PS-ESH-0072 4/30/2012 X26C Laser Safety Program Documentation Orville, Allan 1 1 4/30/2012
PS-ESH-0083 11/18/2011 Laser Safety Program Documentation Bldg 703 E3/E4 Conley, Ray 1 1 11/18/2011
PS-ESH-0085 11/18/2011 Procedure for Replacing HEPA Filters Used as Exhaust Control for Work Involving Nanomaterials Bauer, Debbie A 3 11/18/2011
PS-ESH-0086 12/7/2011 Flow Alarm Procedure for X6B, X7B and X9B Trunk, John 1 5 12/7/2011
PS-ESH-0087 12/20/2011 Hutch Exhaust Flow Test X6, X7, X9 and X14 Chmiel, Robert A 3 12/20/2011
PS-ESH-0088 1/20/2012 Laser Safety Program Documentation 902 Room L1 Stiegler, Lori 1 3 1/20/2012
PS-ESH-0090 6/20/2012 Laser Safety Program Documentation – Raman X18/19 Frenkel Group Stiegler, Lori 1 1
PS-ESH-0091 6/29/2012 NSLS Explosives Training (de minimis quantities) Stiegler, Lori 1 5
PS-ESH-PRM-1.3.5a 12/6/2011 Experiment Safety Review Stiegler, Lori 1 3 12/6/2011
PS-ESH-PRM-1.8.0 3/20/2012 Fall Protection and Elevated Work Chmiel, Robert 1 3 3/20/2012
PS-ESH-PRM-2.3.2 4/30/2012 RF and Microwaves Stiegler, Lori 2 3 4/30/2012
PS-ESH-PRM-2.5.0 4/19/2012 Compressed Gas Cylinder Storage Policy Kiss, Robert 1 3 4/19/2012
PS-ESH-PRM-3.4.1 10/12/2011 Safety System Work Permits McDonald, Thomas 1 3 10/12/2011
PS-ESH-PRM-6.2.0 11/14/2011 Lead Working Requirements Chmiel, Robert 1 3 11/14/2011
PS-ESH-PRM-9.0.1 3/23/2012 Local Emergency Plan Building 725 Chmiel, Robert 1 1 3/23/2012
PS-ESH-PRM-9.0.2 6/10/2011 Local Emergency Plan - Building 817 Chmiel, Robert 1 1 6/10/2011
PS-ESH-PRM-9.0.3 2/29/2012 Local Emergency Plan - Building 832 Chmiel, Robert 1 1
PS-ESH-PRM-9.0.3 1/20/2012 Local Emergency Plan for Building 832 Chmiel, Robert 1 3 1/20/2012
PS-ESH-PRM-9.0.4 6/28/2011 Local Emergency Plan - Building 703 Chmiel, Robert 1 1 6/28/2011
PS-ESH-PRM-9.0.6 3/26/2012 Local Emergency Plan Building 726 Chmiel, Robert 2 1 3/26/2012
PS-ESH-PRM-9.0.7 3/26/2012 Local Emergency Plan Building 727 Chmiel, Robert 2 1 3/26/2012
PS-ESH-PRM-9.0.8 3/26/2012 Local Emergency Plan Building 728 Chmiel, Robert 2 1 3/26/2012
PS-ESH-PRM-9.0.9 3/26/2012 Local Emergency Plan Building 729 Chmiel, Robert 2 1 3/26/2012
PS-ESH-PRM-9.1.0 2/10/2012 Chmiel, Robert 1 3 2/10/2012
PS-FRA-0003 4/16/2012 Slip/Trip Hazards Ackerman, Andrew 1 3 4/16/2012
PS-FRA-0003 4/16/2012 Slip/Trip Hazards Ackerman, Andrew 1 3 4/16/2012
PS-FRA-0006 4/16/2012 General Housekeeping Issues Ackerman, Andrew 1 3 4/16/2012
PS-FRA-0007 4/16/2012 General Noise Issues Ackerman, Andrew 1 3 4/16/2012
PS-JRA-0002 12/28/2011 Work on Electrical Equipment in Zero Energy State Ackerman, Andrew 1 3 12/28/2011
PS-JRA-0003 12/28/2011 Troubleshooting energized electrical equipment in the following range 50v and 24v Ackerman, Andrew 1 3 12/28/2011
PS-JRA-0007 5/27/2011 Resistive Heating for Vacuum Bake Out Ackerman, Andrew 1 3 5/27/2011
PS-JRA-0008 5/27/2011 Work with Vacuum Systems Ackerman, Andrew 1 3 5/27/2011
PS-JRA-0011 5/31/2011 General Flammable Gas Work Ackerman, Andrew 1 3 5/31/2011
PS-JRA-0013 6/29/2011 Hand Held Power Tool Use Ackerman, Andrew 1 3 6/29/2011
PS-JRA-0014 6/28/2011 Hand Tool Use Ackerman, Andrew 1 3 6/28/2011
PS-JRA-0015 5/16/2011 General Instrumentation/Test Equipment Ackerman, Andrew 1 3 5/16/2011
PS-JRA-0017 8/2/2011 Machine Shop Use Ackerman, Andrew 1 3 8/2/2011
PS-JRA-0019 9/1/2011 Mechanical Material Handling Ackerman, Andrew 1 3 9/1/2011
PS-JRA-0022 6/17/2011 Transporting Chemicals and Radioactive Materials Ackerman, Andrew 1 3 6/17/2011
PS-JRA-0025 8/31/2011 Lead Handling - Job Risk Assessment Ackerman, Andrew 1 3 8/31/2011
PS-JRA-0028 10/12/2011 Conduct Accelerator or Beamline Commissioning or Fault Studies Ackerman, Andrew 1 3 10/12/2011
PS-JRA-0029 7/19/2011 Using a Beamline Job Risk Assessment Ackerman, Andrew 1 3 7/19/2011
PS-JRA-0031 5/16/2011 Work With Enclosed RF Systems Ackerman, Andrew 1 3 5/16/2011
PS-JRA-0034 5/20/2011 Photon Sciences OSHAS Job Risk Assessment for Interlock Testing Ackerman, Andrew 1 3 5/20/2011
PS-JRA-0037 6/30/2011 Work in an Oxygen Deficiency Hazard Area Ackerman, Andrew 1 3 6/30/2011
PS-JRA-0042 12/22/2010 Job Risk Assessment - Cable Pulling Hoey, Steve 1 3 12/22/2010
PS-OPS-0005 4/17/2012 Response to Emergencies at the NSLS Chmiel, Robert A 1 4/17/2012
PS-OPS-0006 5/1/2012 Chmiel, Robert A 1 5/1/2012
PS-TRN-CRF-0018 8/16/2012 Photon Sciences Laser OJT Roster Corwin, Mary Anne F 3 8/16/2015
PS-TRN-CRF-0020 5/23/2012 Photon Sciences MHJPM Amplifier (125 kW) Line Winch Roster (Course Code PS-MHJPM-AMPLWINCH) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0021 5/23/2012 Photon Sciences ELEC PPE - Category 1 Roster (Course Code PS-ELEC-PPE-CAT1) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0022 5/23/2012 Photon Sciences ELEC PPE - Category 2 Roster (Course Code PS-ELEC-PPE-CAT2) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0023 5/23/2012 Photon Sciences ELEC PPE - Category 4 Roster (Course Code PS-ELEC-PPE-CAT4) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0024 5/31/2012 Photon Sciences TECH PROC LN2 Manual Fill B725 Rm151A Roster (Course Code PS-TECH-LN2FILL) Corwin, Mary Anne C 3 5/31/2012
PS-TRN-CRF-0026 5/23/2012 Photon Sciences CTRL RM B725 Ops - Chem Spill Response Roster (Course Code PS-CR-B725-CHEMSPILL) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0027 5/23/2012 Photon Sciences CTRL RM B725 Ops - Emergency Response Roster (Course Code PS-CR-B725-EMERGRESP) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0028 5/23/2012 Photon Sciences CTRL RM B725 Ops - Oxygen Def Response Roster (Course Code PS-CR-B725-ODHDEF) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRF-0029 5/23/2012 Photon Sciences CTRL RM B725 Ops - X21 Response Roster (Course Code PS-CR-B725-X21-RESP) Corwin, Mary Anne B 3 5/23/2012
PS-TRN-CRM-0001 4/27/2012 Photon Sciences Environmental Awareness for Electrical and Mechanical Technicians (Course Material) (Course Code PS-ENV-ELECMECH) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0002 4/27/2012 Photon Sciences Environmental Awareness for Crystal Cutting (Course Code - PS-ENV-CRYSTAL-CUT) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0003 4/27/2012 Photon Sciences Environmental Awareness for Crystal Etching (Course Code - PS-ENV-CRYSTAL-ETCH) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0004 4/27/2012 Photon Sciences Environmental Awareness for Lead (Course Code - PS-ENV-LEAD) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0005 4/27/2012 Photon Sciences Environmental Awareness for Photographic Darkroom Operations (Course Code - PS-ENV-PHOTO) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0006 4/27/2012 Photon Sciences Environmental Awareness for Satellite Accumulation Area Manager (Course Code - PS-ENV-SAA) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0007 4/27/2012 Photon Sciences Environmental Awareness for Machine Shop Operations (Course Code - PS-ENV-SHOP) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0008 4/27/2012 Photon Sciences Environmental Awareness for Vacuum Ssytem Maintenance (Course Code - PS-ENV-VAC) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0009 4/27/2012 Photon Sciences Environmental Awareness for Water Systems (Course Code - PS-ENV-WAT) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0011 4/27/2012 Photon Sciences Nano-Science Safety Requirements (Course Code - PS-EXP-NANO-SFTY) Corwin, Mary Anne B 3 4/27/2012
PS-TRN-CRM-0012 4/30/2012 Photon Sciences Americium-241 Sealed Source User Training (Course Code - PS-RAD-AM241) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-CRM-0014 4/30/2012 Photon Sciences Safety Rules for Machine Shop Users (Course Code - PS-MS-SHOP-RULES) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-CRM-0015 4/30/2012 Photon Sciences Work Control Coordinator's Briefing (Course Code - PS-WCC-BRIEF) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-CRM-0016 5/2/2012 Photon Sciences Environment, Safety and Health (ESH) Briefing (Course Code PS-ESH-BRIEF) Corwin, Mary Anne D 3 5/2/2012
PS-TRN-CRM-0017 4/30/2012 Photon Sciences Environment, Safety & Health Briefing for Source Development Laboratory (SDL) (Course Code - PS-ESH-BRIEF-SDL) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-R2A2-0001 4/30/2012 Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Beam Line Local Contact (Course Code PS-R2A2-LOCALCONTACT) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-R2A2-0002 4/30/2012 Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Beam Line Spokesperson (Course Code PS-R2A2-SPOKESPERSON) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-R2A2-0003 4/30/2012 Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Laboratory Steward (Course Code PS-R2A2-LAB-STWD) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-R2A2-0004 4/30/2012 Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Deputy Laboratory Steward (Course Code PS-R2A2-LAB-STWD-DEP) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-R2A2-0005 4/30/2012 Photon Sciences Roles, Responsibilities, Accountabilities and Authorities (R2A2) for Lead Experimenter (Course Code PS-R2A2-LEADEXPRMNTR) Corwin, Mary Anne B 3 4/30/2012
PS-TRN-REQ-0001 11/30/2011 Photon Sciences Training Program Corwin, Mary Anne A 1 11/30/2011
SLS-08.002-007-1 11/13/2009 NSLS Equipment Responsibilities Source Development Laboratory (SDL) Heese, Richard J 1 4/22/2011